Davis-Bacon
NV20260047 (Rev 0)
Coverage: Nevada • Douglas.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| OPERATOR: Backhoe/Excavator/Trackhoe | $50.47 | $30.38 |
| OPERATOR: Bulldozer | $60.39 | $30.38 |
| OPERATOR: Grader/Blade | $50.47 | $30.38 |
| OPERATOR: Loader Loader over 2 1/2 cu.yds. up to and including 4 cu.yds | $50.28 | $30.38 |
| OPERATOR: Oiler | $46.76 | $30.38 |
| OPERATOR: Roller | $60.39 | $30.38 |
| HIGHWAY STRIPING: Laborer | $36.70 | $16.30 |
| LABORER: Mason Tender - Cement/Concrete | $34.20 | $16.30 |
| LABORER: Jackhammer | $34.20 | $16.30 |
| LABORER: Common or General | $33.95 | $16.30 |
| LABORER: Concrete Saw | $34.20 | $16.30 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $36.70 | $16.30 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $34.45 | $16.30 |
| LABORER: Pipelayer | $34.45 | $16.30 |
| TRAFFIC CONTROL: Flagger | $32.08 | $16.30 |
| CEMENT MASON/CONCRETE FINISHER | $33.85 | $15.69 |
| IRONWORKER, REINFORCING | $41.00 | $30.93 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $40.49 | $20.24 |
| OPERATOR: Drill | $46.92 | $25.02 |
| OPERATOR: Mechanic | $44.14 | $17.38 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $40.81 | $25.68 |
| TRUCK DRIVER: Dump Truck | $33.17 | $0.00 |