Davis-Bacon
NV20260040 (Rev 1)
Coverage: Nevada • Washoe.
Published: Jan 30, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $52.36 | $26.62 |
| BRICKLAYER | $42.85 | $17.02 |
| TILE FINISHER | $31.05 | $12.82 |
| TILE SETTER | $37.86 | $15.96 |
| CARPENTER (Includes Acoustical Ceiling Installation, Drywall Hanging, and Metal Stud Installation) | $46.50 | $17.92 |
| ELECTRICIAN | $48.50 | $23.04 |
| ELEVATOR MECHANIC | $84.05 | $38.43 |
| POWER EQUIPMENT OPERATOR (Loader) GROUP 08 | $49.61 | $30.38 |
| GROUP 10 | $50.28 | $30.38 |
| GROUP 11 | $50.71 | $30.38 |
| GROUP 11A | $52.35 | $30.38 |
| POWER EQUIPMENT OPERATOR GROUP 01 | $63.43 | $36.40 |
| GROUP 02 | $63.57 | $36.40 |
| GROUP 03 | $63.79 | $36.40 |
| GROUP 04 | $63.90 | $36.40 |
| GROUP 06 | $64.19 | $36.40 |
| GROUP 08 | $64.52 | $36.40 |
| GROUP 10 | $65.36 | $36.40 |
| GROUP 12 | $65.99 | $36.40 |
| GROUP 16 | $67.41 | $36.40 |
| POWER EQUIPMENT OPERATOR GROUP 04 | $63.90 | $36.40 |
| GROUP 05 | $64.02 | $36.40 |
| GROUP 07 | $64.36 | $36.40 |
| GROUP 09 | $65.20 | $36.40 |
| GROUP 13 | $66.36 | $36.40 |
| GROUP 15 | $67.36 | $36.40 |
| GROUP 17 | $67.91 | $36.40 |
| GROUP 18 | $68.36 | $36.40 |
| GROUP 19 | $69.94 | $36.40 |
| GROUP 20 | $70.55 | $36.40 |
| GROUP 21 | $71.16 | $36.40 |
| GROUP 22 | $71.92 | $36.40 |
| GROUP 23 | $72.38 | $36.40 |
| IRONWORKER, STRUCTURAL | $50.70 | $35.15 |
| IRONWORKER, REINFORCING | $50.70 | $35.15 |
| IRONWORKER, ORNAMENTAL | $50.70 | $35.15 |
| LABORER (1) Common or General | $33.95 | $16.30 |
| Concrete Saw (Hand Held/Walk Behind), Mason Tender - Brick, Mason Tender - Cement/Concrete | $34.20 | $16.30 |
| Pipelayer | $34.45 | $16.30 |
| PAINTER (Spray) | $47.90 | $23.89 |
| PAINTER Brush and Roller Only | $39.43 | $15.71 |
| Drywall Finishing/Taping | $46.00 | $16.21 |
| CEMENT MASON/CONCRETE FINISHER | $43.06 | $13.69 |
| PIPEFITTER | $53.38 | $27.29 |
| ROOFER | $49.65 | $22.19 |
| SHEET METAL WORKER (Includes HVAC Duct and Unit Installation) | $47.51 | $29.38 |
| TRUCK DRIVER (Dump Truck) | $37.21 | $33.41 |
| PLUMBER | $26.34 | $0.00 |