Davis-Bacon
NV20260017 (Rev 1)
Coverage: Nevada • Humboldt.
Published: Jan 30, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (Including Form Work) | $57.69 | $21.53 |
| LINE CONSTRUCTION (Groundman) | $38.74 | $19.36 |
| LINE CONSTRUCTION (Lineman) Lineman | $70.16 | $24.71 |
| POWER EQUIPMENT OPERATOR GROUP 07 | $49.02 | $30.38 |
| GROUP 08 | $49.61 | $30.38 |
| GROUP 10 | $50.28 | $30.38 |
| GROUP 10A | $42.72 | $24.50 |
| GROUP 11 | $50.71 | $30.38 |
| GROUP 11A | $52.35 | $30.38 |
| POWER EQUIPMENT OPERATOR (09) Backhoe Loader Combo | $49.93 | $30.38 |
| POWER EQUIPMENT OPERATOR (Crane) GROUP 12 | $65.99 | $36.40 |
| GROUP 16 | $67.41 | $36.40 |
| GROUP 17 | $67.91 | $36.40 |
| GROUP 19 | $69.94 | $36.40 |
| GROUP 20 | $70.55 | $36.40 |
| GROUP 21 | $71.16 | $36.40 |
| GROUP 22 | $71.92 | $36.40 |
| GROUP 23 | $72.38 | $36.40 |
| IRONWORKER, REINFORCING | $50.70 | $35.15 |
| IRONWORKER, STRUCTURAL | $46.20 | $34.30 |
| LABORER (1) Common or General | $33.95 | $16.30 |
| Concrete Saw (Hand Held/Walk Behind); Mason Tender - Cement/Concrete; | $34.20 | $16.30 |
| Pipelayer | $34.45 | $16.30 |
| LABORER (1) Landscape | $38.53 | $33.41 |
| Asphalt Raker, Shoveler, Spreader and Distributor | $38.74 | $33.41 |
| CEMENT MASON/CONCRETE FINISHER | $40.26 | $0.00 |
| ELECTRICIAN | $38.10 | $13.80 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $39.25 | $21.12 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $49.59 | $7.48 |
| OPERATOR: Mechanic | $32.97 | $17.65 |
| OPERATOR: Roller | $41.60 | $12.77 |
| TRUCK DRIVER: Dump Truck | $31.77 | $4.16 |
| TRUCK DRIVER: Water Truck | $16.64 | $4.16 |