Davis-Bacon
NV20260015 (Rev 1)
Coverage: Nevada • Elko.
Published: Jan 30, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (Includes Form Work) | $46.50 | $17.92 |
| POWER EQUIPMENT OPERATOR GROUP 07 | $49.02 | $30.38 |
| GROUP 08 | $49.61 | $30.38 |
| GROUP 10A | $50.47 | $30.38 |
| POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe) GROUP 10A | $50.47 | $30.38 |
| POWER EQUIPMENT OPERATOR (Crane) GROUP 12 | $65.99 | $36.40 |
| GROUP 16 | $67.41 | $36.40 |
| GROUP 17 | $67.91 | $36.40 |
| GROUP 19 | $69.94 | $36.40 |
| GROUP 20 | $70.55 | $36.40 |
| GROUP 21 | $71.16 | $36.40 |
| GROUP 22 | $71.92 | $36.40 |
| GROUP 23 | $72.38 | $36.40 |
| IRONWORKER, REINFORCING | $48.02 | $27.10 |
| IRONWORKER, STRUCTURAL | $46.20 | $34.30 |
| LABORER (1) Common or General | $33.95 | $16.30 |
| Mason Tender - Cement/Concrete; | $34.20 | $16.30 |
| Pipelayer | $34.45 | $16.30 |
| CEMENT MASON/CONCRETE FINISHER | $40.41 | $0.00 |
| ELECTRICIAN | $39.09 | $14.29 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $25.85 | $19.54 |
| LABORER: Concrete Saw (Hand Held/Walk Behind) | $31.57 | $7.71 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $46.23 | $9.73 |
| OPERATOR: Mechanic | $32.94 | $17.60 |
| OPERATOR: Roller | $36.86 | $16.77 |
| TRUCK DRIVER: Dump Truck | $31.50 | $4.16 |
| TRUCK DRIVER: Water Truck | $16.64 | $4.16 |