Skip to content
Davis-Bacon

MN20260008 (Rev 0)

Coverage: Minnesota • McLeod, Sibley.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
hanical systems. Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)$55.34$34.03
BOILERMAKER$48.00$31.14
BRICKLAYER Bricklayer, Blocklayer, Caulker, Cleaner, Pointer, Stonemason$45.11$25.61
MARBLE SETTER$45.47$26.33
BRICKLAYER Bricklayer, Blocklayer, Stonemason$45.11$25.61
Tile Layer McLeod County$39.17$10.16
Sibley County$34.92$21.81
TILE FINISHER$28.50$8.20
TERRAZZO WORKER/SETTER Base Machine$40.60$21.94
Finisher$42.67$22.04
Mechanic$44.36$22.35
LATHER$39.55$28.63
SOFT FLOOR LAYER$39.03$25.00
MILLWRIGHT$42.95$36.81
CARPENTER$36.71$20.17
Wood Frame Construction$36.71$20.17
Carpenter & Piledrivermen$36.71$20.17
Million and over$44.12$22.57
Million$43.67$22.35
ELECTRICIAN$40.25$23.32
ELEVATOR MECHANIC$62.52$38.43
Power Equipment Operator GROUP 1$35.19$15.95
GROUP 2$34.85$15.95
GROUP 3$33.44$15.95
GROUP 4$33.10$15.95
GROUP 5$32.93$15.95
GROUP 6$31.42$15.95
GROUP 7$30.30$15.95
GROUP 8$28.29$15.95
IRONWORKER$43.00$34.11
Landscaper (Seeding, Sodding , Planting of evergreen & deciduous shrubs & trees on all work, except Residential of 4 units or less)$16.26$9.68
Over) GROUP 1$22.84$16.57
GROUP 2$23.64$16.57
GROUP 3$23.54$16.57
GROUP 4$20.84$16.57
GROUP 1$21.17$15.79
GROUP 2$21.97$15.79
GROUP 3$21.88$15.79
GROUP 4$19.17$15.79
LABORER (Asbestos Abatement)$30.83$17.61
PLASTER TENDER$21.97$15.79
Landscaper (Seeding, Sodding , Planting of evergreen & deciduous shrubs & trees on all work, except Residential of 4 units or less)$28.25$16.20
Over) GROUP 1$20.04$14.70
GROUP 2$20.84$14.70
GROUP 3$20.74$14.70
GROUP 4$18.04$14.70
GROUP 1$18.35$13.94
GROUP 2$19.15$13.94
GROUP 3$19.06$13.94
GROUP 4$16.35$13.94
Painters: Brush; Roller; & Wallpaper Hanger$31.45$17.85
Spray; Steel; Sandblaster; Swing Stage & Epoxy$31.45$17.85
Drywall Finisher$30.17$18.67
Sander$22.63$18.67
Drywall taper/finisher$19.00$25.79
Painters: (1 to 3 stories) Brush & Roller$19.00$3.00
Painters: (4 Stories) Brush & Roller$35.28$25.49
GLAZIER$50.98$27.35
PLASTERER$42.52$30.37
CEMENT MASON/CONCRETE FINISHER$46.46$23.47
PLUMBER$59.54$33.26
PLUMBER (Includes Gas Fitters)$36.78$34.51
PIPEFITTER$37.05$30.27
PIPEFITTER$48.33$40.46
ROOFER$48.32$25.54
SPRINKLER FITTER$42.94$27.26
SHEET METAL WORKER$45.01$26.53

Related Wage Determinations

View directory →