Davis-Bacon
MI20260063 (Rev 2)
Coverage: Michigan • Lapeer.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $43.50 | $36.74 |
| PILEDRIVERMAN | $24.32 | $18.65 |
| CARPENTER, INCLUDES FORM WORK | $36.46 | $23.69 |
| LINE CONSTRUCTION: LINEMEN/CABLE SPLICER | $61.06 | $25.11 |
| ELECTRICIAN | $44.83 | $26.96 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 |
| UIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 |
| PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 |
| LABORER ((7) LANDSCAPE) | $18.29 | $12.85 |
| LABORER ((5) PIPELAYER) | $23.84 | $13.52 |
| LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 |
| LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $29.46 | $16.10 |
| PAINTER: SPRAY (WEST OF HWY. M-53) | $31.01 | $17.19 |
| PAINTER: BRUSH & ROLER (WEST OF HWY. M-53) | $32.58 | $18.12 |
| PAINTER: SPRAY (EAST OF HWY. M-53) | $24.79 | $12.02 |
| PAINTER: BRUSH & ROLLER (EAST OF HWY. M-53) | $23.79 | $12.02 |
| CEMENT MASON/CONCRETE FINISHER | $27.77 | $12.88 |
| PLUMBER/PIPEFITTER | $39.81 | $20.95 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 |
| DAILY | $33.55 | $0.75 |
| TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER | $33.40 | $0.75 |
| DAILY | $33.30 | $0.75 |