Skip to content
Davis-Bacon

GA20260025 (Rev 1)

Coverage: Georgia • Barrow.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
OPERATING ENGINEER: BULLDOZER$28.32$13.45
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings up to 100,000 square feet)$25.49$11.73
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (Buildings over 100,000 square feet)$32.60$15.52
TRUCK DRIVER$12.13$0.00
TILE SETTER$11.07$0.00
ROOFER$11.50$0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$10.95$0.00
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$10.57$0.00
OPERATOR: EXCAVATOR$8.96$0.00
LABORER: MASON TENDER$8.00$0.00
LABORER: COMMON OR GENERAL$10.19$0.00
HVAC MECHANIC (HVAC PIPE INSTALLATION)$11.14$0.00
FORM WORKER$8.50$0.16
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS$11.57$0.00
DRYWALL HANGER$11.42$0.00
DRYWALL FINISHER/TAPER$13.45$0.00
CEMENT MASON/CONCRETE FINISHER$13.02$3.52
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK$12.00$0.00
BRICKLAYER$13.83$0.00

Related Wage Determinations

View directory →