Davis-Bacon
GA20260166 (Rev 2)
Coverage: Georgia • Appling, Atkinson, Bacon +16.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $34.21 | $23.92 |
| ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (APPLING, ATKINSON, BACON, CLINCH, COFFEE, & PIERCE COUNTIES) | $33.35 | $13.40 |
| ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (CLAY COUNTY) | $38.65 | $12.75 |
| ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (BERRIEN, COOK, GRADY, SEMINOLE, & THOMAS COUNTIES) | $33.50 | $13.86 |
| ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (JEFF DAVIS COUNTY) | $32.00 | $14.71 |
| ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (CALHOUN, COLQUITT, IRWIN, MILLER, MITCHELL, & RANDOLPH COUNTIES) | $29.50 | $14.88 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) | $34.00 | $17.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) | $33.00 | $17.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) | $32.00 | $17.70 |
| PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (CLAY COUNTY) | $30.00 | $16.66 |
| LECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (ATIKINSON, BERRIEN, CALHOUN, COFFEE, COLQUITT, COOK, GRADY, IRWIN, MILLER, MITCHELL, RANDOLPH, SEMINOLE, & THOMAS COUNTIES) | $38.98 | $17.01 |
| PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (APPLING, BACON, CLINCH, JEFF DAVIS, & PIERCE COUNTIES) | $34.00 | $16.35 |
| SHEET METAL WORKER: EXCLUDES HVAC DUCT INSTALLATION (APPLING, ATKINSON, BACON, BERRIEN, CLAY, CLINCH, COFFEE, COOK, IRWIN, JEFF DAVIS, MILLER, PIERCE, & SEMINOLE COUNTIES) | $37.75 | $17.95 |
| SHEET METAL WORKER: EXCLUDES HVAC DUCT INSTALLATION (CALHOUN, COLQUITT, GRADY, MITCHELL, RANDOLPH, & THOMAS COUNTIES) | $37.75 | $17.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $19.25 | $2.54 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 |
| ROOFER | $13.62 | $0.00 |
| PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS | $18.55 | $3.35 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $16.38 | $4.56 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.00 | $1.62 |
| OPERATOR: OILER | $12.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.00 | $0.75 |
| LABORER: PIPELAYER | $13.33 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.55 | $0.00 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 |
| GLAZIER | $13.19 | $0.00 |
| ELEVATOR MECHANIC | $19.38 | $14.42 |
| CEMENT MASON/CONCRETE FINISHER | $11.75 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $15.97 | $1.95 |
Related Wage Determinations
View directory →Davis-Bacon
GA20260303 (Rev 2)
Georgia • Clayton
Davis-Bacon
GA20260306 (Rev 2)
Georgia • Floyd
Davis-Bacon
GA20260314 (Rev 2)
Georgia • Bibb, Crawford, Jones +2
Davis-Bacon
GA20260190 (Rev 1)
Georgia • Mitchell
Davis-Bacon
GA20260043 (Rev 1)
Georgia • McIntosh
Davis-Bacon
GA20260047 (Rev 1)
Georgia • Brooks, Echols, Lanier +1