Davis-Bacon
FL20260062 (Rev 1)
Coverage: Florida • Gadsden.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $24.50 | $15.10 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $28.63 | $15.10 |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $36.00 | $15.10 |
| POWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $36.00 | $15.10 |
| SHEET METAL WORKER (EXCLUDES METAL ROOF INSTALLATION) | $31.64 | $15.98 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $9.59 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $10.77 | $0.00 |
| PLUMBER | $13.53 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.00 | $0.00 |
| OPERATOR: TRACTOR | $10.20 | $0.00 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 |
| OPERATOR: SCREED | $10.93 | $0.00 |
| OPERATOR: ROLLER | $10.62 | $0.00 |
| OPERATOR: LOADER | $13.53 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 |
| OPERATOR: EXCAVATOR | $13.50 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 |
| OPERATOR: BULLDOZER | $13.67 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 |
| LABORER: PIPELAYER | $10.06 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 |
| LABORER: COMMON OR GENERAL | $7.92 | $0.00 |
| ELECTRICIAN | $11.54 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $11.88 | $0.00 |
| CARPENTER | $13.53 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 |