Davis-Bacon
FL20260086 (Rev 1)
Coverage: Florida • St Johns.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $23.05 | $13.60 |
| POWER EQUIPMENT OPERATOR: (GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 |
| POWER EQUIPMENT OPERATOR: (CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $31.64 | $15.98 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.14 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $10.62 | $0.00 |
| TILE SETTER | $12.46 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $9.68 | $0.00 |
| PLUMBER | $14.80 | $0.00 |
| PLASTERER | $15.10 | $0.00 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY | $10.68 | $0.00 |
| OPERATOR: TRACTOR | $10.20 | $0.00 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 |
| OPERATOR: SCREED | $10.93 | $0.00 |
| OPERATOR: ROLLER | $10.59 | $0.00 |
| OPERATOR: LOADER | $12.75 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 |
| OPERATOR: BULLDOZER | $12.40 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.72 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 |
| OPERATOR: ASPHALT PAVER | $11.63 | $0.00 |
| LATHER | $14.20 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $8.05 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 |
| LABORER: PIPELAYER | $11.93 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.00 | $0.00 |
| LABORER: ASPHALT RAKER | $10.12 | $0.00 |
| IRONWORKER: STRUCTURAL, REINFORCING AND ORNAMENTAL | $9.00 | $0.00 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | $13.99 | $0.00 |
| FORM WORKER | $12.00 | $0.46 |
| FLOOR LAYER: CARPET | $10.00 | $0.00 |
| ELECTRICIAN | $11.79 | $0.00 |
| DRYWALL HANGER | $11.11 | $0.00 |
| DRYWALL FINISHER/TAPER | $16.13 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.97 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $12.17 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 |