Davis-Bacon
CA20260021 (Rev 1)
Coverage: California • Tulare.
Published: Jan 09, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) | $35.31 | $12.75 |
| Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems) | $64.56 | $25.07 |
| BOILERMAKER | $45.60 | $38.99 |
| MARBLE FINISHER | $42.06 | $19.80 |
| TILE FINISHER | $32.68 | $18.32 |
| TILE LAYER | $50.28 | $22.05 |
| TERRAZZO FINISHER | $44.93 | $20.98 |
| TERRAZZO WORKER/SETTER | $60.58 | $29.79 |
| BRICKLAYER; MARBLE SETTER | $45.53 | $20.29 |
| Diver Assistant Tender, ROV Tender/Technician | $54.10 | $34.69 |
| Diver standby | $60.51 | $34.69 |
| Diver Tender | $59.51 | $34.69 |
| Diver wet | $103.62 | $34.69 |
| Manifold Operator (mixed gas) | $64.51 | $34.69 |
| Piledriver | $54.10 | $34.69 |
| Carpenters Bridge Builder/Highway Carpenter | $52.65 | $30.82 |
| Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer | $45.57 | $30.82 |
| Journeyman Carpenter | $45.42 | $30.82 |
| Millwright | $47.92 | $32.41 |
| ELECTRICIAN | $50.00 | $30.15 |
| LINE CONSTRUCTION (1) Lineman; Cable splicer | $70.16 | $24.71 |
| Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment) | $53.30 | $22.26 |
| Groundman | $40.76 | $21.76 |
| Powderman | $51.87 | $18.79 |
| OPERATOR: Power Equipment (AREA 1:) GROUP 1 | $66.96 | $32.53 |
| GROUP 2 | $65.43 | $32.53 |
| GROUP 3 | $63.95 | $32.53 |
| GROUP 4 | $62.57 | $32.53 |
| GROUP 5 | $61.30 | $32.53 |
| GROUP 6 | $59.98 | $32.53 |
| GROUP 7 | $58.84 | $32.53 |
| GROUP 8 | $57.70 | $32.53 |
| GROUP 8-A | $55.49 | $32.53 |
| OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes | $68.59 | $32.53 |
| Oiler | $43.79 | $31.15 |
| Truck crane oiler | $46.08 | $31.15 |
| GROUP 2 Cranes | $66.08 | $32.53 |
| Oiler | $42.83 | $31.15 |
| Truck crane oiler | $45.07 | $31.15 |
| GROUP 3 Cranes | $64.34 | $32.53 |
| Hydraulic | $44.44 | $31.15 |
| Oiler | $42.55 | $31.15 |
| Truck crane oiler | $44.83 | $31.15 |
| GROUP 4 Cranes | $61.30 | $32.53 |
| OPERATOR: Power Equipment (Piledriving - AREA 1:) GROUP 1 Lifting devices | $52.64 | $31.15 |
| Oiler | $43.38 | $31.15 |
| Truck crane oiler | $45.66 | $31.15 |
| GROUP 2 Lifting devices | $50.82 | $31.15 |
| Oiler | $43.11 | $31.15 |
| Truck crane oiler | $45.41 | $31.15 |
| GROUP 3 Lifting devices | $49.14 | $31.15 |
| Oiler | $42.89 | $31.15 |
| Truck crane oiler | $45.12 | $31.15 |
| GROUP 4 Lifting devices | $47.47 | $31.15 |
| GROUP 5 Lifting devices | $44.73 | $31.15 |
| GROUP 6 Lifting devices | $42.50 | $31.15 |
| OPERATOR: Power Equipment (Steel Erection - AREA 1:) GROUP 1 Cranes | $68.81 | $32.53 |
| Oiler | $43.72 | $31.15 |
| Truck Crane Oiler | $45.95 | $31.15 |
| GROUP 2 Cranes | $67.04 | $32.53 |
| Oiler | $43.45 | $31.15 |
| Truck Crane Oiler | $45.73 | $31.15 |
| GROUP 3 Cranes | $65.56 | $32.53 |
| Hydraulic | $60.61 | $32.53 |
| Oiler | $43.23 | $31.15 |
| Truck Crane Oiler | $38.71 | $31.15 |
| GROUP 4 Cranes | $63.54 | $32.53 |
| GROUP 5 Cranes | $62.24 | $32.53 |
| OPERATOR: Power Equipment (Tunnel and Underground Work - AREA 1:) SHAFTS, STOPES, RAISES: GROUP 1 | $63.06 | $32.53 |
| GROUP 1-A | $65.53 | $32.53 |
| GROUP 2 | $61.80 | $32.53 |
| GROUP 3 | $60.47 | $32.53 |
| GROUP 4 | $59.33 | $32.53 |
| GROUP 5 | $58.19 | $32.53 |
| UNDERGROUND: GROUP 1 | $62.96 | $32.53 |
| GROUP 1-A | $65.43 | $32.53 |
| GROUP 2 | $61.70 | $32.53 |
| GROUP 3 | $60.37 | $32.53 |
| GROUP 4 | $59.23 | $32.53 |
| GROUP 5 | $58.09 | $32.53 |
| Dredging: (DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING:) AREA 1: (1) Leverman | $60.61 | $39.55 |
| Dredge Dozer; Heavy duty repairman | $55.65 | $39.55 |
| Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator | $54.53 | $39.55 |
| Bargeman; Deckhand; Fireman; Leveehand; Oiler | $51.23 | $39.55 |
| AREA 2: (1) Leverman | $62.61 | $39.55 |
| Dredge Dozer; Heavy duty repairman | $57.65 | $39.55 |
| Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator | $56.53 | $39.55 |
| Bargeman; Deckhand; Fireman; Leveehand; Oiler | $53.23 | $39.55 |
| OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1 | $55.85 | $28.56 |
| AREA 2 | $57.85 | $28.56 |
| GROUP 2 AREA 1 | $52.25 | $28.56 |
| AREA 2 | $54.25 | $28.56 |
| GROUP 3 AREA 1 | $47.64 | $28.56 |
| AREA 2 | $49.64 | $28.56 |
| IRONWORKER Fence Erector | $45.78 | $26.51 |
| Ornamental, Reinforcing and Structural | $50.70 | $35.15 |
| LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person | $36.26 | $27.30 |
| Traffic Control Person I | $36.56 | $27.30 |
| Traffic Control Person II | $34.06 | $27.30 |
| Laborers: (CONSTRUCTION CRAFT LABORERS) Construction Specialist Group | $36.20 | $27.30 |
| GROUP 1 | $35.50 | $27.30 |
| GROUP 1-a | $35.72 | $27.30 |
| GROUP 1-c | $35.55 | $27.30 |
| GROUP 1-e | $36.05 | $27.30 |
| GROUP 1-f | $36.08 | $27.30 |
| GROUP 2 | $35.35 | $27.30 |
| GROUP 3 | $35.25 | $27.30 |
| GROUP 4 | $28.94 | $27.30 |
| See groups 1-b and 1-d under laborer classifications Laborers: (GUNITE) GROUP 1 | $36.46 | $27.30 |
| GROUP 2 | $35.96 | $27.30 |
| GROUP 3 | $35.37 | $27.30 |
| GROUP 4 | $35.25 | $27.30 |
| Laborers: (WRECKING) GROUP 1 | $35.50 | $27.30 |
| Landscape Laborer (Gardeners, Horticultural & Landscape Laborers) Establishment Warranty Period | $28.94 | $27.30 |
| New Construction | $35.25 | $27.30 |
| Tunnel and Shaft Laborers: GROUP 1 | $45.89 | $27.72 |
| GROUP 2 | $45.66 | $27.72 |
| GROUP 3 | $45.41 | $27.72 |
| GROUP 4 | $44.96 | $27.72 |
| GROUP 5 | $44.42 | $27.72 |
| Shotcrete Specialist | $46.41 | $27.72 |
| Plasterer tender | $39.77 | $28.54 |
| PAINTER | $36.57 | $22.69 |
| Parking Lot Striping/Highway Marking: GROUP 1 | $40.83 | $17.62 |
| GROUP 2 | $34.71 | $17.62 |
| GROUP 3 | $35.11 | $17.62 |
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 |
| PLUMBER & STEAMFITTER | $54.50 | $42.54 |
| Underground Utility Worker /Landscape Fitter | $36.01 | $18.50 |
| Truck drivers: GROUP 1 | $43.26 | $34.28 |
| GROUP 2 | $43.56 | $34.28 |
| GROUP 3 | $43.86 | $34.28 |
| GROUP 4 | $44.21 | $34.28 |
| GROUP 5 | $44.56 | $34.28 |
Related Wage Determinations
View directory →Davis-Bacon
CA20260026 (Rev 2)
California • San Bernardino
Davis-Bacon
CA20260012 (Rev 2)
California • San Luis Obispo
Davis-Bacon
CA20260025 (Rev 2)
California • Riverside
Davis-Bacon
CA20260001 (Rev 2)
California • San Diego
Davis-Bacon
CA20260024 (Rev 2)
California • Orange
Davis-Bacon
CA20260015 (Rev 2)
California • Ventura