Skip to content
Davis-Bacon

CA20260005 (Rev 1)

Coverage: California • Del Norte, Humboldt, Lake +1.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
TRUCK DRIVERS: GROUP 37 Over 80 to 95 yds$19.14$7.69
TRUCK DRIVERS: GROUP 36 Over 65 to 80 yds$18.99$7.69
Helicopter pilot (when transporting workers ormaterials); Skid (debris box, over 50 yds. and under 65 yds. water level); Truck (dry pre-batch concrete mix, over 50 yds. and under 65 yds. water level)$18.84$7.69
TRUCK DRIVERS: GROUP 34 DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling Aqua/Pak or water tank trailers$18.79$7.69
r (over 35 yds. and including 50 yds. water level); Skid (debris box, over 35 yds. and including 50 yds. water level); Truck (dry pre-batch concrete mix, over 35 yds. and including 50 yds. water level)$18.69$7.69
ase tank trailers or other miscellaneous trailers; Skid (debris box, over 24 yds. and including 35 yds. water level); Truck (dry pre- batch concrete mix, over 24 yds. and including 35 yds. water level)$18.54$7.69
kid (debris box, over 18 yds. and including 24 yds. water level); Transit mix agitator (over 12 yds. through 16 yds.); Truck (dry pre-batch concrete mix, over 18 yds. and including 24 yds. water level)$18.48$7.69
TRUCK DRIVERS: GROUP 30 Truck repair; Hydro-lift or Swedish crane type (including when Swedish crane is used for jetting); Hydro-lift extension or retracting crane (boom-type)$18.47$7.69
TRUCK DRIVERS: GROUP 29 Transit mix agitator (over 14 yds. through 16 yds.)$18.45$7.69
TRUCK DRIVERS: GROUP 28 P.B. or similar type self-loading truck$18.44$7.69
TRUCK DRIVERS: GROUP 27 Double gooseneck (7 or more axles); Heavy-duty transport tiller$18.40$7.69
r (over 12 yds. and including 18 yds. water level); Skid (debris box, over 12 yds. and including 18 yds. water level); Truck (dry pre-batch concrete mix, over 12 yds. and including 18 yds. water level)$18.38$7.69
TRUCK DRIVERS: GROUP 25 Heavy-duty transport (gooseneck lowbed); Transit mix or agitator (over 12 yds. through 14 yds.)$18.35$7.69
eeper with self-contained refuse bin; Skid (debris box, 8 yds. and including 12 yds. water level); Snow Go and/or snow plow; Truck (dry pre-batch concrete mix, 8 yds. and including 12 yds. water level)$18.34$7.69
TRUCK DRIVERS: GROUP 23 Transit mix or agitator (over 10 yds. through 12 yds.)$18.25$7.69
TRUCK DRIVERS: GROUP 22 Combination boot person and road oiler$18.24$7.69
TRUCK DRIVERS: GROUP 21 Jetting truck and water truck (5,000 gallons and under 7,000 gallons)$18.21$7.69
TRUCK DRIVERS: GROUP 20 Vacuum truck (5,500 gallons and under 7,500 gallons)$18.16$7.69
TRUCK DRIVERS: GROUP 19 Transit mix or agitator (8 yds. through 10 yds.)$18.15$7.69
TRUCK DRIVERS: GROUP 18 Ross Hyster and similar straddle carrier$18.14$7.69
TRUCK DRIVERS: GROUP 17 Heavy-duty transport (high bed)$18.12$7.69
TRUCK DRIVERS: GROUP 16 A-frame, winch truck; Buggymobile; Jetting and water truck (4,000 gallons and under 5,000 gallons); Rubber-tired truck jumbo$18.11$7.69
nder 8 yds. water level); Dumpster (6 yds. and under 8 yds. water level); Skid (debris box, 6 yds. and under 8 yds. water level); Truck (dry pre-batch concrete mix, 6 yds. and under 8 yds. water level)$18.10$7.69
TRUCK DRIVERS: GROUP 14 Rubber-tired muck car (not self-loaded)$18.07$7.69
TRUCK DRIVERS: GROUP 13 Vacuum truck, 3,500 gallons and under 5,500 gallons$18.06$7.69
TRUCK DRIVERS: GROUP 12 Combination winch truck with hoist; Transit mix or agitator (6 yds. and under 8 yds.)$18.05$7.69
TRUCK DRIVERS: GROUP 11 Jetting truck and water truck, 2,500 gallons and under 4,000 gallons$18.01$7.69
TRUCK DRIVERS: GROUP 10 Scissor truck; Single unit flat rack (3-axle unit); Industrial lift truck (mechanical tailgate); Small rubber-tired tractor (when used within teamsters' jurisdiction)$18.00$7.69
TRUCK DRIVERS: GROUP 9 Vacuum truck, under 3,500 gallons$17.98$7.69
TRUCK DRIVERS: GROUP 8 Fuel and/or grease truck driver or fuel worker$17.97$7.69
TRUCK DRIVERS: GROUP 7 Transit mix, agitator (under 6 yds.)$17.95$7.69
TRUCK DRIVERS: GROUP 6 Lift jitney, fork lift$17.93$7.69
TRUCK DRIVERS: GROUP 5 Road oil truck or boot$17.92$7.69
TRUCK DRIVERS: GROUP 4 Jetting truck and water truck (under 2,500 gallons)$17.91$7.69
bris box, 4 yds. and under 6 yds. water level); Single unit flat rack (2-axle unit); Industrial lift truck (mechanical tailgate); Truck (dry pre-batch concrete mix, 4 yds. and under 6 yds. water level)$17.90$7.69
TRUCK DRIVERS: GROUP 2 Teamster oiler and/or greaser and/or service$17.88$7.69
ck (when flat rack truck is used appropriate flat rack rate shall apply); Pick-up; Skid (debris box, under 4 yds. water level); Team driver; Truck (dry pre-batch concrete mix, under 4 yds. water level)$17.80$7.69
TILE SETTER$23.35$4.48
TILE FINISHER$16.17$4.98
TERRAZZO FINISHER: TERRAZZO FINISHER (HUMBOLDT, LAKE, MENDOCINO)$16.99$4.18
TERRAZZO FINISHER: TERRAZZO FINISHER DEL NORTE COUNTY$16.72$3.95
TERRAZZO FINISHER: BASE MACHINE OPERATOR HUMBOLDT, LAKE, MENDOCINO$17.69$4.18
TERRAZZO FINISHER: BASE MACHINE OPERATOR DEL NORTE COUNTY$17.42$3.95
SPRINKLER FITTER$24.18$3.75
SHEET METAL WORKER LAKE & MENDOCINO COUNTIES$27.17$7.17
SHEET METAL WORKER DEL NORTE & HUMBOLDT COUNTIES$18.65$4.85
ROOFERS: ROOFER LAKE & MENDOCINO COUNTIES$17.65$7.17
ROOFERS: MASTIC WORKER; KETTLE TENDER (2 KETTLES WITHOUT PUMPS) LAKE & MENDOCINO COUNTIES$17.90$7.17
ROOFERS: ENAMELER & PITCH DEL NORTE$18.30$3.84
ROOFERS: BITUMASTIC; COAL TAR BUILT-UP; ENAMELER; PIPEWRAPPER LAKE & MENDOCINO COUNTIES$19.65$7.17
ROOFER HUMBOLDT COUNTY$12.00$2.00
ROOFER DEL NORTE$16.30$3.84
PREMIUM OF AREA 1$17.31$9.70
PREMIUM OF AREA 1$18.15$9.70
PREMIUM OF AREA 1$18.99$9.70
PREMIUM OF AREA 1$19.97$9.70
PREMIUM OF AREA 1$20.93$9.70
PREMIUM OF AREA 1$21.96$9.70
PREMIUM OF AREA 1$23.04$9.70
PREMIUM OF AREA 1$24.17$9.70
PLUMBER AND STEAMFITTER DEL NORTE & HUMBOLDT COUNTIES$16.47$9.45
PLASTERER$17.73$8.22
PARKING LOT STRIPING/HIGHWAY MARKING: SLURRY SEAL WORK: SEALER/MIXER$14.54$3.52
PARKING LOT STRIPING/HIGHWAY MARKING: SLURRY SEAL WORK: OPERATOR & SHUTTLE$12.88$3.52
NG SYSTEMS INSTALLER: removes; relocates; installs permanently affixed roadside and parking delineation barricades; fencing, guard rail; cable anchor, retaining walls, reference signs, monument markers$16.83$3.52
PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatings$14.31$3.52
rumble and traffic bars, adhesives, guide markers; other traffic delineating devices; includes all related surface preparation (sandblasting, waterblasting, grinding) as part of the application process$15.99$3.52
PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 1 STRIPER: Layout and application of painted traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings$16.83$3.52
PAINTERS: SANDBLASTING; SPRAY; STEAM-CLEANING LAKE AND MENDOCINO COUNTIES$21.28$4.68
PAINTERS: PAPERHANGER; SANDBLASTER; SPRAY; STRUCTURAL STEEL; SWING STAGE; TAPER DEL NORTE AND HUMBOLDT COUNTIES$12.76$2.43
PAINTERS: DRYWALL FINISHER; PAPERHANGER LAKE AND MENDOCINO COUNTIES$21.78$4.68
PAINTERS: BRUSH; ROLLER DEL NORTE AND HUMBOLDT COUNTIES$12.51$2.43
PAINTERS: BRUSH LAKE AND MENDOCINO COUNTIES$20.78$4.68
MARBLE FINISHER HUMBOLDT, LAKE & MENDOCINO COUNTIES$15.22$3.92
MARBLE FINISHER DEL NORTE COUNTY$13.92$3.67
MARBLE AND TERRAZZO SETTER$21.09$4.13
LINE CONSTRUCTION, LINE TECHNICIAN (LAKE AND MENDICINO COUNTIES:)$22.85$5.43
LINE CONSTRUCTION, LINE TECHNICIAN (HUMBOLDT COUNTY:)$17.41$6.03
LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR (LAKE AND MENDICINO COUNTIES:)$18.22$5.29
LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR (HUMBOLDT COUNTY:)$15.67$5.96
LINE CONSTRUCTION, GROUP 7 (DEL NORTE COUNTY: ZONE 1:)$13.23$3.71
LINE CONSTRUCTION, GROUP 6 (DEL NORTE COUNTY: ZONE 1:)$14.07$3.74
LINE CONSTRUCTION, GROUP 5 (DEL NORTE COUNTY: ZONE 1:)$14.07$3.74
LINE CONSTRUCTION, GROUP 4 (DEL NORTE COUNTY: ZONE 1:)$16.08$3.81
LINE CONSTRUCTION, GROUP 3 (DEL NORTE COUNTY: ZONE 1:)$15.35$3.79
LINE CONSTRUCTION, GROUP 2 (DEL NORTE COUNTY: ZONE 1:)$18.65$3.90
LINE CONSTRUCTION, GROUP 1 (DEL NORTE COUNTY: ZONE 1:)$20.63$3.97
LINE CONSTRUCTION, GROUND PERSON (LAKE AND MENDICINO COUNTIES:)$18.28$5.29
LINE CONSTRUCTION, CABLE SPLICER (LAKE AND MENDICINO COUNTIES:)$25.14$5.49
LANDSCAPE LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS): NEW CONSTRUCTION$16.36$5.96
LANDSCAPE LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS): ESTABLISHMENT WARRANTY PERIOD$10.05$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$16.61$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$10.05$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$16.36$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$16.46$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$17.19$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$17.16$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$16.86$5.96
per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day$16.66$5.96
per day on recently active large diameter sewers or sewer manholes$16.83$5.96
LABORER: GUNITE GROUP 3 General laborer$17.36$5.96
LABORER: GUNITE GROUP 2 Rebound$16.48$5.96
LABORER: GUNITE GROUP 1 Nozzle operator (including gun, pot); Ground$17.07$5.96
LABORER: GROUP 3 General laborer (includes all clean-up work, loading lumber, loading and burning of debris) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES$16.36$5.96
LABORER: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES$16.46$5.96
LABORER: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows, doors, plumbing and electric fixtures) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES$16.61$5.96
IRONWORKERS: ORNAMENTAL, REINFORCING, & STRUCTURAL$19.15$8.93
IRONWORKERS: FENCE ERECTOR$18.26$8.93
INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$21.60$5.61
GLAZIER$16.31$6.19
FLOOR LAYER: CARPET LAKE & MENDOCINO$18.73$0.00
FLOOR LAYER: CARPET DEL NORTE & HUMBOLDT$14.19$4.41
ELEVATOR MECHANIC$31.06$3.87
ELECTRICIANS: CABLE SPLICER$18.80$6.09
INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION); EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORM$13.62$1.31
ELECTRICIAN$17.41$6.05
DRYWALL INSTALLERS/LATHERS: DRYWALL STOCKER, SCRAPPER & CLEAN-UP$9.54$7.40
DRYWALL INSTALLERS/LATHERS: DRYWALL INSTALLER/LATHER$19.08$7.40
DIVER: (DIVER TENDER)$20.38$6.16
DIVER$31.63$9.88
CEMENT MASONS: CEMENT MASON$17.91$6.18
CEMENT MASONS: (SWING OR SLIP FORM SCAFFOLD; MASTIC, MAGNESITE, GYPSUM, EPOXY, POLYESTER, RESIN & ALL COMPOSITION)$18.16$6.18
CARPENTERS: PILEDRIVERMAN - BRIDGE BUILDING$21.21$6.92
CARPENTERS: PILEDRIVERMAN$19.38$9.88
CARPENTERS: MILLWRIGHT$19.73$8.20
CARPENTERS: (HARDWOOD FLOOR LAYER; POWER SAW OPERATOR; SAW FILER; SHINGLER; STEEL SCAFFOLD ERECTOR; STEEL SHORING)$19.23$6.96
CARPENTER$19.08$6.92
BRICKLAYER, STONEMASON$22.45$8.60
BRICK TENDER$18.54$3.86
BOILERMAKER$21.60$4.25

Related Wage Determinations

View directory →