Davis-Bacon
CA20260005 (Rev 0)
Coverage: California • Del Norte, Humboldt, Lake +1.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $21.60 | $4.25 |
| Brick Tender | $18.54 | $3.86 |
| Bricklayer, Stonemason | $22.45 | $8.60 |
| Carpenters: Carpenter | $19.08 | $6.91 |
| Hardwood floor layer; Power saw operator; Saw filer; Shingler; Steel scaffold erector; Steel shoring | $19.23 | $6.95 |
| Millwright | $19.73 | $8.20 |
| Piledriverman - bridge building | $21.21 | $6.91 |
| Piledriverman | $19.38 | $9.88 |
| Cement Masons: Cement mason | $17.91 | $6.18 |
| Swing or slip form scaffold; Mastic, magnesite, gypsum, epoxy, polyester, resin & all composition | $18.16 | $6.18 |
| Diver Diver tender | $20.38 | $6.16 |
| Diver | $31.63 | $9.88 |
| Drywall Installers/Lathers: Drywall installer/lather | $19.08 | $7.40 |
| Drywall stocker, scrapper & clean-up | $9.54 | $7.40 |
| ELEVATOR MECHANIC | $31.06 | $3.87 |
| Lake & Mendocino | $18.73 | $0.00 |
| Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems | $21.60 | $5.61 |
| Ironworkers: Fence erector | $18.26 | $8.93 |
| Ornamental, Reinforcing, & Structural | $19.15 | $8.93 |
| LABORER: Gunite GROUP 1 | $17.07 | $5.96 |
| GROUP 2 | $16.48 | $5.96 |
| GROUP 3 | $17.36 | $5.96 |
| Laborer: Wrecking, buildings and miscellaneous structures GROUP 1 | $16.61 | $5.96 |
| GROUP 2 | $16.46 | $5.96 |
| GROUP 3 | $16.36 | $5.96 |
| See GROUP 1-b & GROUP 1-g under the descriptions of groups.) GROUP 1 | $16.61 | $5.96 |
| GROUP 1-a | $16.83 | $5.96 |
| GROUP 1-c | $16.66 | $5.96 |
| GROUP 1-d | $16.86 | $5.96 |
| GROUP 1-e | $17.16 | $5.96 |
| GROUP 1-f | $17.19 | $5.96 |
| GROUP 4 | $10.05 | $5.96 |
| Landscape Laborer GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: Establishment warranty period | $10.05 | $5.96 |
| New construction | $16.36 | $5.96 |
| Marble and terrazzo setter | $21.09 | $4.13 |
| MARBLE FINISHER Del Norte County | $13.92 | $3.67 |
| Humboldt, Lake & Mendocino Counties | $15.22 | $3.92 |
| Painters: Del Norte and Humboldt Counties: Brush; roller | $12.51 | $2.43 |
| Paperhanger; Sandblaster; Spray; Structural steel; Swing stage; Taper | $12.76 | $2.43 |
| Lake and Mendocino Counties: Brush | $20.78 | $4.68 |
| Drywall Finisher; Paperhanger | $21.78 | $4.68 |
| Sandblasting; Spray; Steam- cleaning | $21.28 | $4.68 |
| Parking Lot Striping/Highway Marking: GROUP 1 | $16.83 | $3.52 |
| GROUP 2 | $15.99 | $3.52 |
| GROUP 3 | $14.31 | $3.52 |
| GROUP 4 | $16.83 | $3.52 |
| Slurry seal work: Operator & Shuttle | $12.88 | $3.52 |
| Sealer/mixer | $14.54 | $3.52 |
| PLASTERER | $17.73 | $8.22 |
| Plumber and Steamfitter Del Norte & Humboldt Counties | $16.47 | $9.45 |
| Lake & Mendocino Counties | $29.84 | $12.53 |
| Premium of Area 1) AREA 1: GROUP 1 | $24.17 | $9.70 |
| GROUP 2 | $23.04 | $9.70 |
| GROUP 3 | $21.96 | $9.70 |
| GROUP 4 | $20.93 | $9.70 |
| GROUP 5 | $19.97 | $9.70 |
| GROUP 6 | $18.99 | $9.70 |
| GROUP 7 | $18.15 | $9.70 |
| GROUP 8 | $17.31 | $9.70 |
| Roofers: Del Norte Enameler & Pitch | $18.30 | $3.84 |
| Roofer | $16.30 | $3.84 |
| Humboldt County | $12.00 | $2.00 |
| Lake & Mendocino Counties Bitumastic; Coal tar Built-up; Enameler; Pipewrapper | $19.65 | $7.17 |
| Mastic worker; Kettle tender (2 kettles without pumps) | $17.90 | $7.17 |
| Roofer | $17.65 | $7.17 |
| Sheet Metal Worker Del Norte & Humboldt Counties | $18.65 | $4.85 |
| Lake & Mendocino Counties | $27.17 | $7.17 |
| SPRINKLER FITTER | $24.18 | $3.75 |
| TERRAZZO FINISHER Del Norte County Base Machine Operator | $17.42 | $3.95 |
| Terrazzo Finisher | $16.72 | $3.95 |
| Humboldt, Lake, Mendocino Base Machine Operator | $17.69 | $4.18 |
| Terrazzo Finisher | $16.99 | $4.18 |
| TILE SETTER | $23.35 | $4.48 |
| Truck drivers: GROUP 1 | $17.80 | $7.69 |
| GROUP 2 | $17.88 | $7.69 |
| GROUP 3 | $17.90 | $7.69 |
| GROUP 4 | $17.91 | $7.69 |
| GROUP 5 | $17.92 | $7.69 |
| GROUP 6 | $17.93 | $7.69 |
| GROUP 7 | $17.95 | $7.69 |
| GROUP 8 | $17.97 | $7.69 |
| GROUP 9 | $17.98 | $7.69 |
| GROUP 10 | $18.00 | $7.69 |
| GROUP 11 | $18.01 | $7.69 |
| GROUP 12 | $18.05 | $7.69 |
| GROUP 13 | $18.06 | $7.69 |
| GROUP 14 | $18.07 | $7.69 |
| GROUP 15 | $18.10 | $7.69 |
| GROUP 16 | $18.11 | $7.69 |
| GROUP 17 | $18.12 | $7.69 |
| GROUP 18 | $18.14 | $7.69 |
| GROUP 19 | $18.15 | $7.69 |
| GROUP 20 | $18.16 | $7.69 |
| GROUP 21 | $18.21 | $7.69 |
| GROUP 22 | $18.24 | $7.69 |
| GROUP 23 | $18.25 | $7.69 |
| GROUP 24 | $18.34 | $7.69 |
| GROUP 25 | $18.35 | $7.69 |
| GROUP 26 | $18.38 | $7.69 |
| GROUP 27 | $18.40 | $7.69 |
| GROUP 28 | $18.44 | $7.69 |
| GROUP 29 | $18.45 | $7.69 |
| GROUP 30 | $18.47 | $7.69 |
| GROUP 31 | $18.48 | $7.69 |
| GROUP 32 | $18.54 | $7.69 |
| GROUP 33 | $18.69 | $7.69 |
| GROUP 34 | $18.79 | $7.69 |
| GROUP 35 | $18.84 | $7.69 |
| GROUP 36 | $18.99 | $7.69 |
| GROUP 37 | $19.14 | $7.69 |
Related Wage Determinations
View directory →Davis-Bacon
CA20260026 (Rev 2)
California • San Bernardino
Davis-Bacon
CA20260012 (Rev 2)
California • San Luis Obispo
Davis-Bacon
CA20260025 (Rev 2)
California • Riverside
Davis-Bacon
CA20260001 (Rev 2)
California • San Diego
Davis-Bacon
CA20260024 (Rev 2)
California • Orange
Davis-Bacon
CA20260015 (Rev 2)
California • Ventura