Skip to content
Davis-Bacon

CA20260004 (Rev 0)

Coverage: California • Del Norte, Humboldt, Lake +1.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) (1) Mendocino County$64.56$25.07
Del Norte, Humboldt, Lake Counties$64.56$25.07
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)$35.31$12.75
MARBLE FINISHER$42.06$19.80
MARBLE MASON$61.72$30.31
BRICKLAYER$57.02$28.50
TERRAZZO FINISHER$44.93$20.98
TERRAZZO WORKER/SETTER$60.58$29.79
TILE FINISHER Del Norte & Humboldt Counties$37.75$19.28
Lake & Mendocino Counties$35.78$19.23
TILE LAYER Del Norte & Humboldt Counties$59.92$22.62
Lake & Mendocino Counties$56.79$22.54
Diver Assistant Tender, ROV Tender/Technician$54.10$34.69
Diver standby$60.51$34.69
Diver Tender$59.51$34.69
Diver wet$103.62$34.69
Manifold Operator (mixed gas)$64.51$34.69
Piledriver$54.10$34.69
Carpenters Bridge Builder/Highway Carpenter$54.85$31.49
Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer$47.77$31.49
Journeyman Carpenter$47.62$31.49
Millwright$50.12$33.08
ELECTRICIAN$59.17$32.04
Electricians$59.17$32.04
LINE CONSTRUCTION (1) Lineman; Cable splicer$70.16$24.71
Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)$53.30$22.26
Groundman$40.76$21.76
Powderman$51.87$18.79
OPERATOR: Power Equipment (AREA 1:) GROUP 1$66.96$32.53
GROUP 2$65.43$32.53
GROUP 3$63.95$32.53
GROUP 4$62.57$32.53
GROUP 5$61.30$32.53
GROUP 6$59.98$32.53
GROUP 7$58.84$32.53
GROUP 8$57.70$32.53
GROUP 8-A$55.49$32.53
OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes$68.59$32.53
Oiler$43.79$31.15
Truck crane oiler$46.08$31.15
GROUP 2 Cranes$66.08$32.53
Oiler$42.83$31.15
Truck crane oiler$45.07$31.15
GROUP 3 Cranes$64.34$32.53
Hydraulic$44.44$31.15
Oiler$42.55$31.15
Truck crane oiler$44.83$31.15
GROUP 4 Cranes$61.30$32.53
OPERATOR: Power Equipment (Piledriving - AREA 1:) GROUP 1 Lifting devices$52.64$31.15
Oiler$43.38$31.15
Truck Crane Oiler$45.66$31.15
GROUP 2 Lifting devices$50.82$31.15
Oiler$43.11$31.15
Truck Crane Oiler$45.41$31.15
GROUP 3 Lifting devices$49.14$31.15
Oiler$42.89$31.15
Truck Crane Oiler$45.12$31.15
GROUP 4 Lifting devices$47.37$31.15
GROUP 5 Lifting devices$44.73$31.15
GROUP 6 Lifting devices$42.50$31.15
OPERATOR: Power Equipment (Steel Erection - AREA 1:) GROUP 1 Cranes$68.81$32.53
Oiler$43.72$31.15
Truck Crane Oiler$45.95$31.15
GROUP 2 Cranes$67.04$32.53
Oiler$43.45$31.15
Truck Crane Oiler$45.73$31.15
GROUP 3 Cranes$65.56$32.53
Hydraulic$60.61$32.53
Oiler$43.23$31.15
Truck Crane Oiler$45.46$31.15
GROUP 4 Cranes$63.54$32.53
GROUP 5 Cranes$62.24$32.53
OPERATOR: Power Equipment (Tunnel and Underground Work - AREA 1:) SHAFTS, STOPES, RAISES: GROUP 1$63.06$32.53
GROUP 1-A$65.53$32.53
GROUP 2$61.80$32.53
GROUP 3$60.47$32.53
GROUP 4$59.33$32.53
GROUP 5$58.19$32.53
UNDERGROUND: GROUP 1$62.96$32.53
GROUP 1-A$65.43$32.53
GROUP 2$61.70$32.53
GROUP 3$60.37$32.53
GROUP 4$59.23$32.53
GROUP 5$58.09$32.53
OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1$55.85$28.56
AREA 2$57.85$28.56
GROUP 2 AREA 1$52.25$28.56
AREA 2$54.25$28.56
GROUP 3 AREA 1$47.64$28.56
AREA 2$49.64$28.56
Ironworkers: Fence Erector$45.78$26.51
Ornamental, Reinforcing and Structural$43.75$34.45
Ornamental, Reinforcing and Structural$50.70$35.15
LABORER (ASBESTOS/MOLD/LEAD LABORER) Area 1$39.15$30.03
Area 2$38.15$30.03
LABORER Mason Tender-Brick$37.54$25.55
LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person$36.26$27.30
Traffic Control Person I$36.56$27.30
Traffic Control Person II$34.06$27.30
Laborers: (CONSTRUCTION CRAFT LABORERS) Construction Specialist Group$36.20$27.30
GROUP 1$35.50$27.30
GROUP 1-a$35.72$27.30
GROUP 1-c$35.55$27.30
GROUP 1-e$36.05$27.30
GROUP 1-f$36.08$27.30
GROUP 2$35.35$27.30
GROUP 3$35.25$27.30
GROUP 4$28.94$27.30
See groups 1-b and 1-d under laborer classifications Laborers: (GUNITE) GROUP 1$36.46$27.30
GROUP 2$35.96$27.30
GROUP 3$35.37$27.30
GROUP 4$35.25$27.30
Laborers: (WRECKING) GROUP 1$35.50$27.30
Landscape Laborer (Gardeners, Horticultural & Landscape Laborers) Establishment Warranty Period$28.94$27.30
New Construction$35.25$27.30
Tunnel and Shaft Laborers: GROUP 1$45.89$27.72
GROUP 2$45.66$27.72
GROUP 3$45.41$27.72
GROUP 4$44.96$27.72
GROUP 5$44.42$27.72
Shotcrete Specialist$46.41$27.72
LABORER Mason Tender-Brick$36.84$26.24
Painters$53.38$28.04
Painters: Brush & Roller$13.35$2.94
Sandblaster, spray, structural steel & swing stage$13.60$2.94
Parking Lot Striping/Highway Marking: GROUP 1$40.83$17.62
GROUP 2$34.71$17.62
GROUP 3$35.11$17.62
CEMENT MASON/CONCRETE FINISHER$32.15$23.27
Landscape/Irrigation Fitter (Underground/Utliity Fitter)$77.35$36.53
cial work such as hospitals, prisons, hotels, schools, casinos, wastewater treatment plants, and research facilities as well as refrigeration pipefitting, service and repair work - MARKET RECOVERY RATE$69.70$46.38
All other work - NEW CONSTRUCTION RATE$91.00$49.40
Underground Utility Worker /Landscape Fitter$36.01$18.50
or less$55.92$45.29
All other work$64.06$46.83
Truck drivers: GROUP 1$43.26$34.28
GROUP 2$43.56$34.28
GROUP 3$43.86$34.28
GROUP 4$44.21$34.28
GROUP 5$44.56$34.28

Related Wage Determinations