Amendment 0001 for solicitation SP470326Q0026 is being issued due to minor SOW revisions. The SOW has been revised to specify the option for using precast…
Award information is as follows: Awardee: GVC Construction Inc. 305 Leominster Shirely Road Lunenburg, MA 01462 Total Award Amount: $81,880.00 The award…
A 2025 Phase II ESA conducted at the Site identified soil contamination from several metals and polycyclic aromatic hydrocarbons. The objective of this…
JELA 311263 - Canal Backfill Restoration
This is a reposting of a pre-solicitation notice for an upcoming USACE Construction Project that was previously posted under W912P626B0001. Please take notice…
A 2025 Phase II ESA conducted at the Site identified soil contamination from several metals and polycyclic aromatic hydrocarbons. The objective of this…
DEMOLITION OF SIX STRUCTURES AT TLAS - Amendment 0002
Amendment 4 is issued to post site visit sign in, Q&A, Revised SOW 4-2-2026, Leconte Lodge Weather considerations, and List of services at LeConte Lodge. Due…
THE WORK CONSISTS OF: Furnish all labor, materials, and equipment necessary to stabilize three hundred and ten feet (310 ) of streambank along the West River,…
DEMOLITION OF SIX STRUCTURES AT TLAS - Amendment 0002
Sources Sought Notice SOURCES SOUGHT - Project No. 687-24-101 Demo Regrade Connecting Corridor This is a SOURCES SOUGHT ANNOUNCEMENT ONLY. This is not a…
Dear Prospective Offeror: Subject: Request for Quotes 19RM2826Q0002 Enclosed is a Request for Quotes (RFQ) for infrastructure works that will include trenching…
AMENDMENT 1: THIS AMENDMENT UPDATED SITE VISIT INFORMATION IN BLOCK 10 OF SOLICIATION (SF 1442) . A SITE VISIT WILL BE HELD 14 APR 2026 AT 10:00 AM EST. MQ-9…
THE WORK CONSISTS OF: Furnish all labor, materials, and equipment necessary to stabilize three hundred and ten feet (310 ) of streambank along the West River,…
436-24-105 Miles City VA Campus Demolition
AMENDMENT 1: THIS AMENDMENT UPDATED SITE VISIT INFORMATION IN BLOCK 10 OF SOLICIATION (SF 1442) . A SITE VISIT WILL BE HELD 14 APR 2026 AT 10:00 AM EST. MQ-9…
The Contractor shall provide all management, tools, supplies, equipment, and labor necessary for the demolishment of seven(7) buildings at JBSA Lackland:…
CAPE COD NATIONAL SEASHORE - REPLACE EGGLESTON & DELFINO SEPTIC