Skip to content
Provo City

2026 Provo City Crack Seal Project

Solicitation: Not available
Notice ID: ut-u3p-216588
DepartmentProvo CityAgencyCitiesStateUTPostedDueFeb 23, 2026, 09:00 PM UTCExpired

Federal opportunity from CITIES • Provo City. Place of performance: UT. Response deadline: Feb 23, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Provo City
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Description

2026 Provo City Crack Seal Project

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Executive summary

The 2026 Provo City Crack Seal Project involves addressing pavement maintenance needs within Provo City. Bidders must prepare to respond by the deadline of February 23, 2026. This project focuses on specialized asphalt maintenance, likely aimed at preserving existing infrastructure.

What the buyer is trying to do

The buyer aims to engage contractors for the maintenance of city roadways, specifically through crack sealing to prevent further deterioration of asphalt surfaces.

Work breakdown
  • Assessment of roadway conditions
  • Preparation of crack sealing material
  • Application of crack sealant
  • Post-application inspections
Response package checklist
  • Company qualifications and experience with similar projects
  • Detailed project timeline
  • Budget proposal and pricing mechanism
  • Safety and compliance certifications
Suggested keywords
pavement maintenancecrack sealingasphalt preservationroadway infrastructurepublic works
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No budget estimate provided
  • Specific project requirements yet to be detailed
  • Additional procurement documents not available
  • No previous contractor performance data accessible
  • Details on weather impact assessments are lacking

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.