Skip to content
Provo City

2026 Provo City Road Rehabilitation

Solicitation: Not available
Notice ID: ut-u3p-214496
DepartmentProvo CityAgencyCitiesStateUTPostedDueMar 05, 2026, 09:00 PM UTCExpired

Federal opportunity from CITIES • Provo City. Place of performance: UT. Response deadline: Mar 05, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,152,973,770
Sector total $7,152,973,770 • Share 100.0%
Live
Median
$193,915
P10–P90
$36,617$1,592,548
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,152,973,770)
Deal sizing
$193,915 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260021 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260021 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260109 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
CARPENTER (Excludes Form Work)
Base $32.17Fringe $17.50
Rate
POWER EQUIPMENT OPERATOR Grader/Blade
Base $31.99Fringe $17.64
Rate
Oiler
Base $31.99Fringe $17.64
+32 more occupation rates in this WD
Davis-Baconstate match
UT20260076 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Sanpete
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
SPRINKLER FITTER (Fire Sprinklers)
Base $42.17Fringe $26.63
Rate
SHEET METAL WORKER (HVAC Duct Installation Only)
Base $46.79Fringe $14.89
+13 more occupation rates in this WD
Davis-Baconstate match
UT20260094 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Washington
Rate
POWER EQUIPMENT OPERATOR (Mechanic)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (Flagger)
Base $23.71Fringe $9.78
Rate
CEMENT MASON/CONCRETE FINISHER
Base $19.69Fringe $1.17
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Provo City
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Description

2026 Provo City Road Rehabilitation

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 26, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The 2026 Provo City Road Rehabilitation project aims to enhance the infrastructure of Provo City through comprehensive road improvements. The response deadline for this project is set for March 5, 2026. Companies interested in this opportunity should prepare proposals that meet local compliance requirements and reflect an understanding of road rehabilitation practices.

road rehabilitationinfrastructure improvementProvo Cityconstruction project
What the buyer is trying to do

The buyer is looking to contract a firm capable of executing substantial road rehabilitation efforts within Provo City to improve transportation and safety for residents.

Who should pursue this
  • Construction firms with experience in road rehabilitation
  • Local contractors familiar with Provo City regulations
  • Engineering firms specializing in transportation infrastructure
Work breakdown
No work breakdown extracted.
Response package checklist
  • Project proposal outlining methodology
  • Detailed pricing breakdown
  • Company qualifications and past performance examples
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
No compliance notes extracted.
Pricing strategy
  • Consider competitive pricing in relation to local market standards
  • Prepare for potential cost implications of environmental compliance
Teaming and subs
No teaming notes extracted.
Risks and watchouts
  • Potential delays due to weather conditions
  • Unexpected local regulations or permits
  • Community opposition to construction projects
Smart questions to ask
  • What specific road sections are prioritized for rehabilitation?
  • Are there existing plans or studies available to applicants regarding current road conditions?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific details on the scope of work
  • No indication of budget or funding sources
  • Lack of specific compliance requirements or codes
  • Absence of performance metrics or evaluation criteria
  • No defined project start and end dates
  • No contact information for the buyer
  • No attachments providing detailed project information
  • No clarity on potential for subcontracting opportunities

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.