Skip to content
Lehi City

Shadow Ridge Water Main RFB

Solicitation: Not available
Notice ID: ut-u3p-222337
DepartmentLehi CityAgencyCitiesStateUTPostedDueFeb 26, 2026, 12:00 AM UTCExpired

Federal opportunity from CITIES • Lehi City. Place of performance: UT. Response deadline: Feb 26, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260037 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Utah
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
+48 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 48 more rate previews.
Davis-BaconBest fitstate match
UT20260037 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
Rate
Backhoe/Excavator, Front End Loader (Over 5 cu. yds. )
Base $25.37Fringe $15.65
+47 more occupation rates in this WD
Davis-Baconstate match
UT20260018 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Carbon
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+35 more occupation rates in this WD
Davis-Baconstate match
UT20260109 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
CARPENTER (Excludes Form Work)
Base $32.17Fringe $17.50
Rate
POWER EQUIPMENT OPERATOR Grader/Blade
Base $31.99Fringe $17.64
Rate
Oiler
Base $31.99Fringe $17.64
+32 more occupation rates in this WD
Davis-Baconstate match
UT20260104 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Box Elder
Rate
CARPENTER, Includes Form Work
Base $22.84Fringe $4.64
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.19Fringe $6.82
Rate
ELECTRICIAN, Includes Low Voltage Wiring
Base $32.24Fringe $7.85
+31 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Lehi City
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Description

Shadow Ridge Water Main RFB

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Shadow Ridge Water Main Request for Bid (RFB) is open for submissions from interested parties until February 26, 2026. This project, facilitated by the CITIES agency, targets essential infrastructure improvements for water distribution. Companies with experience in municipal water main installation and maintenance are particularly encouraged to participate.

Water Main InstallationMunicipal InfrastructureShadow Ridge ProjectBid SubmissionCITIES Agency
What the buyer is trying to do

The buyer is seeking qualified contractors to submit bids for the installation and upgrade of the water main system at Shadow Ridge, ensuring compliance with local regulations and standards.

Who should pursue this
  • Contractors specializing in water infrastructure
  • Companies with experience in municipal projects
  • Firms with licenses and compliance in water main installation
Work breakdown
  • Project scope definition
  • Site assessment
  • Preparation of bid documents
  • Bid review and evaluation
  • Contract award and performance monitoring
Response package checklist
  • Cover letter
  • Completed bid form
  • Technical proposal
  • Cost breakdown
  • Proof of relevant experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to local water regulations
  • Compliance with environmental standards required
Pricing strategy
  • Consider competitive pricing based on local benchmarks
  • Factor in potential unforeseen costs in water main projects
Teaming and subs
  • Engage local subcontractors for labor
  • Consider teaming with engineers for project oversight
Risks and watchouts
  • Potential for cost overruns due to unforeseen site conditions
  • Delays in bid submission affecting timeline
  • Non-compliance penalties for regulatory violations
Smart questions to ask
  • What are the specific local regulations governing water main installation?
  • What is the anticipated timeline for project completion?
  • Are there existing utility conflicts that could affect the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific details about project scope are unclear
  • Location specifics of the Shadow Ridge site are missing
  • No information on project funding or budget available
  • Lack of attachments or additional documentation
  • Information on required licenses or certifications isn't provided

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.