Skip to content
Division of Purchasing

Farr West City- Public Works Facility Phase 3

Solicitation: Not available
Notice ID: ut-u3p-222214
DepartmentDivision of PurchasingStateUTPostedDueFeb 26, 2026, 09:00 PM UTCCloses in 0 days

Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Feb 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Division of Purchasing
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Farr West City- Public Works Facility Phase 3

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Executive summary

This opportunity involves the development of Phase 3 of the Public Works Facility for Farr West City, as announced by the Division of Purchasing. The response deadline for proposals is set for February 26, 2026, offering a considerable amount of time for preparation. Stakeholders should prepare for collaboration and innovation in facility design and construction to meet city infrastructure needs.

What the buyer is trying to do

Farr West City is looking to advance the development of its Public Works Facility, emphasizing the need for efficient construction solutions and modern infrastructure capabilities.

Work breakdown
  • Understanding project requirements and scope of Phase 3 development
  • Design and engineering services for the facility
  • Construction management and oversight
  • Quality assurance and compliance checks
  • Final inspection and facility handover
Response package checklist
  • Executive summary of the bidding firm
  • Detailed project plan and timeline
  • Cost breakdown and pricing strategy
  • Previous project examples and references
  • Compliance with local regulations and codes
Suggested keywords
Farr West CityPublic Works Facilityconstructionmunicipal projectengineeringfacility development
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget or funding source details provided
  • Lack of specified project scope or requirements for Phase 3
  • Absence of past project timelines or benchmarks
  • No indication of expected outcomes or performance metrics
  • No details on stakeholder involvement during the bidding process
  • Missing links to additional resource documents
  • Lack of previous proposal examples for better understanding
  • No site location or constraints outlined

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.