Skip to content
Division of Purchasing

Farr West City- Public Works Facility Phase 3

Solicitation: Not available
Notice ID: ut-u3p-222214
DepartmentDivision of PurchasingStateUTPostedDueFeb 26, 2026, 09:00 PM UTCExpired

Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Feb 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,152,973,770
Sector total $7,152,973,770 • Share 100.0%
Live
Median
$193,915
P10–P90
$36,617$1,592,548
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,152,973,770)
Deal sizing
$193,915 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260021 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260021 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260109 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
CARPENTER (Excludes Form Work)
Base $32.17Fringe $17.50
Rate
POWER EQUIPMENT OPERATOR Grader/Blade
Base $31.99Fringe $17.64
Rate
Oiler
Base $31.99Fringe $17.64
+32 more occupation rates in this WD
Davis-Baconstate match
UT20260076 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Sanpete
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
SPRINKLER FITTER (Fire Sprinklers)
Base $42.17Fringe $26.63
Rate
SHEET METAL WORKER (HVAC Duct Installation Only)
Base $46.79Fringe $14.89
+13 more occupation rates in this WD
Davis-Baconstate match
UT20260094 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Washington
Rate
POWER EQUIPMENT OPERATOR (Mechanic)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (Flagger)
Base $23.71Fringe $9.78
Rate
CEMENT MASON/CONCRETE FINISHER
Base $19.69Fringe $1.17
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Purchasing
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Farr West City- Public Works Facility Phase 3

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This opportunity involves the development of Phase 3 of the Public Works Facility for Farr West City, as announced by the Division of Purchasing. The response deadline for proposals is set for February 26, 2026, offering a considerable amount of time for preparation. Stakeholders should prepare for collaboration and innovation in facility design and construction to meet city infrastructure needs.

Farr West CityPublic Works Facilityconstructionmunicipal projectengineeringfacility development
What the buyer is trying to do

Farr West City is looking to advance the development of its Public Works Facility, emphasizing the need for efficient construction solutions and modern infrastructure capabilities.

Who should pursue this
  • Construction firms with experience in municipal projects
  • Architectural firms specializing in public infrastructure
  • Engineering consultancies with a track record in facility development
Work breakdown
  • Understanding project requirements and scope of Phase 3 development
  • Design and engineering services for the facility
  • Construction management and oversight
  • Quality assurance and compliance checks
  • Final inspection and facility handover
Response package checklist
  • Executive summary of the bidding firm
  • Detailed project plan and timeline
  • Cost breakdown and pricing strategy
  • Previous project examples and references
  • Compliance with local regulations and codes
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to municipal codes and standards for public infrastructure
  • Certifications required for construction practices and materials
  • Safety protocols during construction phases
Pricing strategy
  • Consider competitive pricing with justified cost elements
  • Factor in potential unforeseen expenses related to public approvals
  • Assess fixed-price contracting to mitigate risk for the city
Teaming and subs
  • Form partnerships with local subcontractors for specialized services
  • Incorporate a landscape architect for outdoor spaces
  • Collaborate with environmental consultants for sustainable design
Risks and watchouts
  • Potential delays in permitting processes
  • Budget overruns due to design changes
  • Community opposition to construction during operational phases
Smart questions to ask
  • What are the city's long-term goals for the Public Works Facility?
  • Are there existing design plans or concepts for Phase 3?
  • What limitations exist regarding materials and procurement for the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget or funding source details provided
  • Lack of specified project scope or requirements for Phase 3
  • Absence of past project timelines or benchmarks
  • No indication of expected outcomes or performance metrics
  • No details on stakeholder involvement during the bidding process
  • Missing links to additional resource documents
  • Lack of previous proposal examples for better understanding
  • No site location or constraints outlined

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.