Skip to content
Division of Purchasing

NC26-57 Rocky Ford Phase 2 Lop and Scatter

Solicitation: Not available
Notice ID: ut-u3p-222734
DepartmentDivision of PurchasingStateUTPostedDueFeb 27, 2026, 09:00 PM UTCExpired

Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Feb 27, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,152,973,770
Sector total $7,152,973,770 • Share 100.0%
Live
Median
$193,915
P10–P90
$36,617$1,592,548
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,152,973,770)
Deal sizing
$193,915 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260021 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260021 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260109 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
CARPENTER (Excludes Form Work)
Base $32.17Fringe $17.50
Rate
POWER EQUIPMENT OPERATOR Grader/Blade
Base $31.99Fringe $17.64
Rate
Oiler
Base $31.99Fringe $17.64
+32 more occupation rates in this WD
Davis-Baconstate match
UT20260076 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Sanpete
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
SPRINKLER FITTER (Fire Sprinklers)
Base $42.17Fringe $26.63
Rate
SHEET METAL WORKER (HVAC Duct Installation Only)
Base $46.79Fringe $14.89
+13 more occupation rates in this WD
Davis-Baconstate match
UT20260094 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Washington
Rate
POWER EQUIPMENT OPERATOR (Mechanic)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (Flagger)
Base $23.71Fringe $9.78
Rate
CEMENT MASON/CONCRETE FINISHER
Base $19.69Fringe $1.17
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Purchasing
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

NC26-57 Rocky Ford Phase 2 Lop and Scatter

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The NC26-57 Rocky Ford Phase 2 Lop and Scatter opportunity presents a significant procurement by the Division of Purchasing. Bidders will need to focus on vegetation management as indicated in the project title. The response deadline is set for February 27, 2026, which allows ample time for proposal preparation.

vegetation managementLop and ScatterRocky Fordforestry servicesecological restoration
What the buyer is trying to do

The buyer is seeking contractors to perform vegetation management specifically through the Lop and Scatter method in Rocky Ford.

Who should pursue this
  • Companies with experience in vegetation management
  • Contractors specializing in forestry services
  • Firms familiar with ecological restoration practices
Work breakdown
  • Vegetation assessment and site preparation
  • Implementation of Lop and Scatter technique
  • Post-project evaluation and reporting
Response package checklist
  • Technical proposal outlining experience and methods
  • Project timeline and milestones
  • Cost proposal including detailed pricing breakdown
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
No compliance notes extracted.
Pricing strategy
  • Consider local market rates for vegetation management services
  • Incorporate fixed costs and variable costs for flexibility
Teaming and subs
  • Partnerships with environmental consultants
  • Engagement with local labor or support services
Risks and watchouts
  • Regulatory changes impacting vegetation management practices
  • Potential for unforeseen site conditions impacting costs
Smart questions to ask
  • What specific vegetation types are targeted for Lop and Scatter?
  • Are there any local regulations that will affect the project execution?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications or scope of work
  • Geographic limits of the work area
  • Specific environmental regulations to consider
  • Expected deliverables format post-project
  • Technical qualifications required from bidders
  • Performance metrics for project success
  • Any mandatory site visits or pre-proposal conferences
  • Funding sources or budget constraints

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.