Skip to content
Division of Facilities Construction and Management

DFCM Construction - Prequalified Paving & Site Civil Stage II - Department of Natural Resources/State Parks - Frontier Homestead Pave West Area Expansion - Project #26294510

Solicitation: Not available
Notice ID: ut-u3p-219988

Federal opportunity from EXECUTIVE BRANCH AGENCIES • Division of Facilities Construction and Management. Place of performance: UT. Response deadline: Feb 24, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$6,934,604,320
Sector total $6,934,604,320 • Share 100.0%
Live
Median
$206,573
P10–P90
$30,957$1,243,935
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($6,934,604,320)
Deal sizing
$206,573 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260026 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Duchesne
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260026 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Duchesne
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260109 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
CARPENTER (Excludes Form Work)
Base $32.17Fringe $17.50
Rate
POWER EQUIPMENT OPERATOR Grader/Blade
Base $31.99Fringe $17.64
Rate
Oiler
Base $31.99Fringe $17.64
+32 more occupation rates in this WD
Davis-Baconstate match
UT20260111 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Weber
Rate
CARPENTER, Includes Form Work
Base $22.84Fringe $4.64
Rate
CEMENT MASON/CONCRETE FINISHER
Base $18.94Fringe $2.41
Rate
ELECTRICIAN, Includes Low Voltage Wiring
Base $32.24Fringe $7.85
+31 more occupation rates in this WD
Davis-Baconstate match
UT20260103 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Carbon, Daggett, Rich +1
Rate
CARPENTER, Includes Form Work
Base $22.34Fringe $3.48
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.21Fringe $2.87
Rate
ELECTRICIAN
Base $26.83Fringe $0.00
+26 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Facilities Construction and Management
Agency
EXECUTIVE BRANCH AGENCIES
Subagency
EXECUTIVE BRANCH AGENCIES
Office
DFCM
Contracting Office Address
Not available

Description

DFCM Construction - Prequalified Paving & Site Civil Stage II - Department of Natural Resources/State Parks - Frontier Homestead Pave West Area Expansion - Project #26294510

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

The DFCM Construction project for the Department of Natural Resources involves the Prequalified Paving & Site Civil Stage II for the Frontier Homestead Pave West Area Expansion. This opportunity, identified by Project #26294510, has a response deadline of February 24, 2026. Bidders must be prequalified and possess the necessary expertise in paving and site civil projects to participate.

pavingsite civil workprequalified contractorsstate parks expansionDFCM construction
What the buyer is trying to do

The buyer aims to expand the West Area of the Frontier Homestead by executing paving and civil work in collaboration with selected prequalified contractors.

Who should pursue this
  • Prequalified paving contractors
  • Civil engineering firms with relevant experience
  • Companies specialized in outdoor park development
Work breakdown
  • Initial site assessment and preparation
  • Excavation and grading
  • Paving of roads and pathways
  • Installation of drainage systems
  • Landscaping and finishing touches
Response package checklist
  • Prequalification documentation
  • Detailed project proposal
  • Cost estimates
  • Timeline for completion
  • Company qualifications and past performance examples
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to state procurement regulations
  • Environmental regulations related to park development
  • Need for bonding and insurance requirements
Pricing strategy
  • Competitive cost analysis based on local market rates
  • Consideration of long-term maintenance costs
  • Value engineering options to minimize expenses
Teaming and subs
  • Partner with local subcontractors for site preparation
  • Engage engineering firms for design consultation
  • Collaborate with environmental specialists for compliance
Risks and watchouts
  • Potential delays due to weather conditions
  • Regulatory changes affecting project scope
  • Public opposition related to park expansions
Smart questions to ask
  • What specific qualifications are required for prequalification?
  • Are there historical data or past performance metrics on similar projects?
  • What are the materials preferred for paving?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Budget range for the project
  • Exact location specifics for work execution
  • Details on prequalification criteria
  • Any mandatory pre-bid meetings or site visits
  • Explicit materials or techniques preferred for construction

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.