Skip to content
Division of Facilities Construction and Management

DFCM Construction - Invitational - Snow College - Snow College Exit Sign Replacement- Project #26108700

Solicitation: Not available
Notice ID: ut-u3p-220266

Federal opportunity from EXECUTIVE BRANCH AGENCIES • Division of Facilities Construction and Management. Place of performance: UT. Response deadline: Feb 25, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,206,283,725
Sector total $7,206,283,725 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,015,226
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,206,283,725)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260033 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Morgan
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
+49 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 49 more rate previews.
Davis-BaconBest fitstate match
UT20260033 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Morgan
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
Rate
Backhoe/Excavator, Front End Loader (Over 5 cu. yds. )
Base $25.37Fringe $15.65
+48 more occupation rates in this WD
Davis-Baconstate match
UT20260105 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Cache
Rate
CARPENTER, Includes Form Work
Base $21.87Fringe $2.80
Rate
CEMENT MASON/CONCRETE FINISHER
Base $20.24Fringe $6.20
Rate
HIGHWAY/PARKING LOT STRIPING: Painter
Base $19.52Fringe $1.62
+25 more occupation rates in this WD
Davis-Baconstate match
UT20260012 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Iron
Rate
TRUCK DRIVER (Water Truck)
Base $29.53Fringe $14.65
Rate
CARPENTER, Includes Form Work
Base $22.07Fringe $6.88
Rate
CEMENT MASON/CONCRETE FINISHER
Base $17.36Fringe $2.04
+25 more occupation rates in this WD
Davis-Baconstate match
UT20260091 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Davis
Rate
POWER EQUIPMENT OPERATOR (Mechanic)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (Flagger)
Base $23.71Fringe $9.78
Rate
TRUCK DRIVER (Dump Truck)
Base $29.67Fringe $14.65
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Division of Facilities Construction and Management
Agency
EXECUTIVE BRANCH AGENCIES
Subagency
EXECUTIVE BRANCH AGENCIES
Office
DFCM
Contracting Office Address
Not available

Description

DFCM Construction - Invitational - Snow College - Snow College Exit Sign Replacement- Project #26108700

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.