DFCM Construction - Prequalified Mechanical Stage II - Snow College - Washburn Nail Salon HVAC Upgrades- Project #26110700
Federal opportunity from EXECUTIVE BRANCH AGENCIES • Division of Facilities Construction and Management. Place of performance: UT. Response deadline: Feb 25, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 35 more rate previews.↓
Point of Contact
Agency & Office
Description
DFCM Construction - Prequalified Mechanical Stage II - Snow College - Washburn Nail Salon HVAC Upgrades- Project #26110700
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The DFCM Construction project focuses on HVAC upgrades at Snow College's Washburn Nail Salon (Project #26110700). This is a prequalified mechanical job, indicating a need for experienced contractors in HVAC systems. The response deadline is set for February 25, 2026, allowing ample time for proposal preparation.
The buyer aims to upgrade the HVAC systems at the Washburn Nail Salon to enhance functionality and comfort for users.
- HVAC contractors with experience in educational facilities
- Mechanical engineers with a focus on HVAC systems
- Companies that are DFCM prequalified
- Review existing HVAC systems
- Design new HVAC solutions
- Procurement of HVAC equipment
- Installation of HVAC systems
- Testing and commissioning
- Proof of DFCM prequalification
- Detailed project plan
- Timeline for project completion
- Cost estimates and pricing proposal
- Relevant past project references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adhere to DFCM standards for mechanical installations
- Ensure compliance with relevant building codes and regulations
- Include necessary licenses and insurance certificates
- Competitive pricing based on market standards for HVAC upgrades
- Consideration of long-term maintenance costs
- Detailed breakdown of labor, materials, and overhead costs
- Partnerships with HVAC equipment suppliers
- Involvement of mechanical engineers in planning stages
- Collaboration with previous DFCM project contractors if applicable
- Delays in equipment procurement affecting the timeline
- Potential changes in project scope after bidding
- Challenges in meeting DFCM compliance requirements
- What specific performance metrics does the buyer expect from the new HVAC system?
- Are there any existing infrastructure constraints to consider?
- What is the budget range for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific performance requirements for the HVAC systems
- Details on existing HVAC system issues
- Information on budget constraints or funding
- Clarification on any additional compliance requirements
- List of required licenses beyond DFCM prequalification
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.