Skip to content
City of Saratoga Springs

RFP for Saratoga Springs - Fire Station Construction Manager General Contractor "CM/GC" services for new construction of the Fire Station

Solicitation: Not available
Notice ID: ut-u3p-220800
DepartmentCity of Saratoga SpringsAgencyCitiesStateUTPostedDueFeb 24, 2026, 12:00 AM UTCExpired

Federal opportunity from CITIES • City of Saratoga Springs. Place of performance: UT. Response deadline: Feb 24, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Live POP
Place of performance
Utah
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260037 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Utah
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
+48 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 48 more rate previews.
Davis-BaconBest fitstate match
UT20260037 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
OPERATOR: Power Equipment (1) Mechanic
Base $27.55Fringe $15.65
Rate
a) Blade/Grader
Base $25.89Fringe $15.65
Rate
Backhoe/Excavator, Front End Loader (Over 5 cu. yds. )
Base $25.37Fringe $15.65
+47 more occupation rates in this WD
Davis-Baconstate match
UT20260018 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Carbon
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+35 more occupation rates in this WD
Davis-Baconstate match
UT20260109 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Utah
Rate
CARPENTER (Excludes Form Work)
Base $32.17Fringe $17.50
Rate
POWER EQUIPMENT OPERATOR Grader/Blade
Base $31.99Fringe $17.64
Rate
Oiler
Base $31.99Fringe $17.64
+32 more occupation rates in this WD
Davis-Baconstate match
UT20260104 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Box Elder
Rate
CARPENTER, Includes Form Work
Base $22.84Fringe $4.64
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.19Fringe $6.82
Rate
ELECTRICIAN, Includes Low Voltage Wiring
Base $32.24Fringe $7.85
+31 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Saratoga Springs
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Description

RFP for Saratoga Springs - Fire Station Construction Manager General Contractor "CM/GC" services for new construction of the Fire Station

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The RFP for the Saratoga Springs Fire Station seeks proposals for Construction Manager General Contractor services specifically for the new construction of the Fire Station. The response deadline is set for February 24, 2026. This project presents a significant opportunity for contractors with expertise in municipal building projects and fire station construction.

Construction Manager General ContractorFire Station ConstructionSaratoga Springs RFP
What the buyer is trying to do

The buyer aims to select a Construction Manager General Contractor to oversee and manage the new construction of a fire station in Saratoga Springs, ensuring timely and within-budget delivery of quality work.

Who should pursue this
  • General contractors with CM/GC experience
  • Firms with a proven track record in municipal projects
  • Companies experienced in fire station construction
Work breakdown
  • Project planning and scheduling
  • Budget management and cost estimation
  • Coordination with subcontractors
  • Quality control and assurance
  • Compliance with municipal regulations
Response package checklist
  • Company profile and relevant experience
  • Detailed project approach
  • Team qualifications and past performance
  • Cost proposal
  • Timeline and project milestones
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local construction codes
  • Follow procurement regulations for public contracts
Pricing strategy
  • Consider competitive pricing while ensuring quality and scope are not compromised
  • Include contingencies for budget variability
Teaming and subs
  • Electrical, plumbing, and HVAC subcontractors
  • Safety management firms
  • Material suppliers with fire station experience
Risks and watchouts
  • Potential delays due to regulatory approvals
  • Budget overruns if not managed effectively
  • Coordination challenges with multiple subcontractors
Smart questions to ask
  • What is the expected timeline for project approval and start?
  • Are there any specific local regulations to be aware of?
  • What is the anticipated budget range for the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications
  • Scope of work nuances
  • Local subcontractor availability
  • Project funding details
  • Agency contact information
  • Decision-making criteria
  • Specific compliance requirements
  • Site conditions assessments

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.