Nellie Muir Elementary RTU and kitchen Addition
Federal opportunity from Woodburn School District. Place of performance: OR. Response deadline: Aug 12, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
Nellie Muir Elementary RTU and kitchen Addition
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Woodburn School District is seeking bids for the Nellie Muir Elementary RTU and kitchen addition project, with a response deadline of August 12, 2022. This opportunity focuses on the construction of additional space for kitchen facilities and improved heating, ventilation, and air conditioning (HVAC) systems. Bidders should gear up to provide detailed proposals that align with the specific needs of the school district.
The Woodburn School District is aiming to expand and enhance the kitchen and HVAC facilities at Nellie Muir Elementary, which is critical for improving the school's infrastructure.
- Contractors specializing in educational facility construction
- HVAC system installers
- General contractors with experience in similar projects
- Design and engineering services for the addition
- Construction of the kitchen addition
- Installation of heating and air conditioning systems
- Site preparation and utility hookups
- Detailed project proposal including design plans
- Bidders' qualifications and past project list
- Pricing breakdown for each component of the project
- Timeline for each phase of the project
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with state building codes
- Adhere to local zoning regulations
- Consider competitive pricing to reflect the school district's budget constraints
- Include costs for potential contingencies
- Seek subcontractors with specific expertise in kitchen construction and HVAC systems
- Collaborate with local firms for material sourcing to reduce costs
- Potential delay in obtaining necessary permits
- Risk of cost overruns if scope is not well defined
- Unforeseen site conditions affecting the construction timeline
- What specific requirements does the school district have for the kitchen facilities?
- Are there any existing structural challenges at the site that we should be aware of?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No details on specific budget or funding sources
- No solicitation number provided
- No contact information for the buyer
- No listed requirements or specifications for the HVAC system
- No information on previous projects or incumbent contractors
- No data on potential contractor limitations or preferences
- No details about site access and logistics
- No timeline provided for construction phases
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.