Davis-Bacon
OR20260066 (Rev 1)
Coverage: Oregon • Douglas.
Published: Jan 23, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $47.04 | $21.84 |
| ELECTRICIAN | $50.03 | $24.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 | $56.66 | $16.90 |
| GROUP 1A | $58.82 | $16.90 |
| GROUP 1B | $60.98 | $16.90 |
| GROUP 2 | $54.75 | $16.90 |
| GROUP 3 | $53.60 | $16.90 |
| GROUP 4 | $50.27 | $16.90 |
| GROUP 5 | $49.03 | $16.90 |
| GROUP 6 | $45.81 | $16.90 |
| IRONWORKER (Reinforcing and Structural) | $48.31 | $34.52 |
| Laborers: (Mason Tender-Cement/Concrete) | $43.79 | $17.05 |
| Laborers: GROUP 1 | $39.11 | $17.30 |
| GROUP 2 | $40.41 | $17.30 |
| Painters: Brush, Roller and Spray | $39.94 | $16.68 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 |
| TRUCK DRIVER GROUP 1 | $35.41 | $18.30 |
| GROUP 2 | $35.57 | $18.30 |
| GROUP 3 | $35.74 | $18.30 |
| GROUP 4 | $36.08 | $18.30 |
| GROUP 5 | $36.35 | $18.30 |
| GROUP 6 | $36.57 | $18.30 |
| GROUP 7 | $36.82 | $18.30 |
| CARPENTER, Includes Form Work | $23.20 | $9.47 |
| LABORER: Common or General | $18.72 | $5.99 |
| LABORER: Flagger | $17.61 | $5.96 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $22.77 | $7.90 |
| OPERATOR: Broom/Sweeper | $32.31 | $6.43 |
| OPERATOR: Excavator | $21.68 | $5.88 |
| OPERATOR: Mechanic | $19.84 | $6.14 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $27.59 | $2.96 |
| TRUCK DRIVER: Off the Road Truck | $31.81 | $6.33 |
Related Wage Determinations
View directory →Davis-Bacon
OR20260056 (Rev 1)
Oregon • Jackson
Davis-Bacon
OR20260007 (Rev 1)
Oregon • Klamath
Davis-Bacon
OR20260071 (Rev 1)
Oregon • Klamath
Davis-Bacon
OR20260070 (Rev 1)
Oregon • Josephine
Davis-Bacon
OR20260009 (Rev 1)
Oregon • Baker, Crook, Gilliam +4
Davis-Bacon
OR20260001 (Rev 1)
Oregon • Baker, Benton, Clackamas +33