ITB-2526-119 Vocera Electrical Infrastructure Installation
Federal opportunity from P030101 - Purchasing | P0301 - Business Operations • North Clackamas School District. Place of performance: OR. Response deadline: Apr 09, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 30 more rate previews.↓
Point of Contact
Agency & Office
Description
ITB-2526-119 Vocera Electrical Infrastructure Installation Install dedicated outlets and circuits in identified locations (provided by District), to support new communication equipment charging stations.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The State of Oregon is seeking bids for ITB-2526-119, focusing on the installation of electrical infrastructure to support new communication equipment charging stations. The project entails creating dedicated outlets and circuits at specific locations identified by the District. The response deadline for this solicitation is April 9, 2026, allowing ample time for bidders to prepare their proposals.
The buyer intends to install dedicated electrical outlets and circuits to accommodate new communication equipment charging stations as specified by the District.
- Site assessment and verification of locations for installation
- Installation of dedicated electrical outlets
- Installation of dedicated circuits
- Final inspection and testing of installations
- Completed bid proposal form
- Detailed project timeline
- Proof of relevant licenses and certifications
- References from previous similar projects
- Cost breakdown for materials and labor
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific locations for installation are not detailed in the notice.
- Total budget for the project is not provided.
- Information on previous similar projects undertaken by the District is missing.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.