Skip to content
North Clackamas School District

ITB-2526-119 Vocera Electrical Infrastructure Installation

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P03012-00016218

Federal opportunity from P030101 - Purchasing | P0301 - Business Operations • North Clackamas School District. Place of performance: OR. Response deadline: Apr 09, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,005,945,060
Sector total $2,005,945,060 • Share 100.0%
Live
Median
$165,737
P10–P90
$28,800$2,500,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,005,945,060)
Deal sizing
$165,737 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260066 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
ELECTRICIAN
Base $50.03Fringe $24.00
+30 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 30 more rate previews.
Davis-BaconBest fitstate match
OR20260066 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
ELECTRICIAN
Base $50.03Fringe $24.00
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+29 more occupation rates in this WD
Davis-Baconstate match
OR20260103 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Jackson, Josephine
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
TILE FINISHER
Base $32.68Fringe $16.48
+27 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
North Clackamas School District
Agency
P030101 - Purchasing | P0301 - Business Operations
Subagency
P030101 - Purchasing | P0301 - Business Operations
Office
Megan Jelley | Megan Jelley Senior Purchasing Specialist 12400 SE Freeman Way Milwaukie, Oregon 97222 Phone: 503-353-6082 E-mail: jelleym@nclack.k12.or.us
Contracting Office Address
Not available

Description

ITB-2526-119 Vocera Electrical Infrastructure Installation Install dedicated outlets and circuits in identified locations (provided by District), to support new communication equipment charging stations.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 06, 2026
Executive summary

The State of Oregon is seeking bids for ITB-2526-119, focusing on the installation of electrical infrastructure to support new communication equipment charging stations. The project entails creating dedicated outlets and circuits at specific locations identified by the District. The response deadline for this solicitation is April 9, 2026, allowing ample time for bidders to prepare their proposals.

What the buyer is trying to do

The buyer intends to install dedicated electrical outlets and circuits to accommodate new communication equipment charging stations as specified by the District.

Work breakdown
  • Site assessment and verification of locations for installation
  • Installation of dedicated electrical outlets
  • Installation of dedicated circuits
  • Final inspection and testing of installations
Response package checklist
  • Completed bid proposal form
  • Detailed project timeline
  • Proof of relevant licenses and certifications
  • References from previous similar projects
  • Cost breakdown for materials and labor
Suggested keywords
Voceraelectrical installationcommunication equipmentdedicated circuitscharging stations
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific locations for installation are not detailed in the notice.
  • Total budget for the project is not provided.
  • Information on previous similar projects undertaken by the District is missing.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.