Prequalification for Major Equipment Suppliers - Generator Step-Up Unit (GSU) Transformer
Federal opportunity from Truckee Meadows Water Authority. Place of performance: NV. Response deadline: Apr 07, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
This request for pre-qualifications is on behalf of RSCI not for Truckee Meadows Water Authority. All evaluations will be made by RSCI. DO NOT SUBMIT YOUR PREQUALIFICATION APPLICATION IN NGEM. FOLLOW THE INSTRUCTIONS OUTLINED IN THE DOCUMENT UPLOADED ON THE ATTACHMENTS TAB. RSCI is the Construction Manager at Risk (CMAR) hereby requesting that Major Equipment Suppliers submit Statement of Prequalification Applications pursuant to NRS chapter 338.16991 for the above project. Major Equipment items include: Generator Step-Up Unit (GSU) Transformer The system includes the Generator Step-Up Unit (GSU) transformer, monitoring current transformers (CTs) and other ancillary components. The transformer will be an oil-filled 4160V-24,900KV (delta-wye) pad-mounted step-up transformer and shall be rated at 3500kVA with an estimated impedance of 5 to 8 percent. The transformer will be connected to the 4160V Metal Enclosed Load Interrupter Switchgear via underground ductbank on the low-side and to Vacuum Fault Interrupter (supplied by Others) on the high-side and will be installed in a secondary oil containment structure. A transformer protection scheme will be designed and will have the ability to trip the unit breakers and upstream line breaker in event of transformer related fault. Special Federal Conditions will apply in order for this project to be eligible for Federal Tax Credits.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.