Skip to content
Clark County

Pinto Campus IT, Boiler Replacement

Solicitation: Not available
Notice ID: nv_ionwave__607735-25
DepartmentClark CountyStateNVPostedMar 03, 2026, 12:00 AM UTCDueApr 02, 2026, 02:15 PM UTCCloses in 30 days

Federal opportunity from Clark County, Nevada. Place of performance: NV. Response deadline: Apr 02, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$67,693,638,528
Sector total $67,693,638,528 • Share 100.0%
Live
Median
$335,971
P10–P90
$30,094$5,389,799
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($67,693,638,528)
Deal sizing
$335,971 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 30, 2026
Nevada • Clark
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base: $62.00 • Fringe: $23.48
BRICKLAYER
Base: $53.57 • Fringe: $20.05
TILE FINISHER
Base: $37.35 • Fringe: $14.22
Match signal: state match
Published Jan 30, 2026
Nevada • Esmeralda, Mineral
CARPENTER (Including Form Work)
Base: $57.69 • Fringe: $21.53
LINE CONSTRUCTION (Groundman)
Base: $38.74 • Fringe: $19.36
LINE CONSTRUCTION (Lineman) Lineman
Base: $70.16 • Fringe: $24.71
Match signal: state match
Published Jan 30, 2026
Nevada • Lander
OPERATOR: Asphalt/Concrete Laydown
Base: $60.39 • Fringe: $30.38
OPERATOR: Bulldozer
Base: $60.39 • Fringe: $30.38
OPERATOR: Grader/Blade
Base: $50.47 • Fringe: $30.38
Match signal: state match
Published Jan 30, 2026
Nevada • Pershing
OPERATOR: Asphalt/Concrete Laydown
Base: $60.39 • Fringe: $30.38
OPERATOR: Bobcat/Skid Steer/Skid Loader
Base: $47.56 • Fringe: $30.38
OPERATOR: Bulldozer
Base: $60.39 • Fringe: $30.38
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Clark County, Nevada
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Federal opportunity from Clark County, Nevada. Place of performance: NV. Response deadline: Apr 02, 2026.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.