2026 Short Line Striping
Federal opportunity from Carson City, Nevada. Place of performance: NV. Response deadline: Mar 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
2026 Short Line Striping Project No. | P303826001 PWP No. | CC-2026-266 Engineer's Estimate $210,000 Summary Carson City is accepting sealed bids for all labor, materials, equipment, and incidentals necessary for the 2026 Shortline Striping Project. Short-line striping will include transverse markings like crosswalks, stop bars, and symbols along Carson Street and College Parkway from College Drive to Lompa Lane. The project is to be completed by September 30, 2026. Funding This project is locally funded. BABAA This project is not subject to BABAA requirements. Type This project is deemed a horizontal construction project. Pre-Bid Meeting This project will not conduct a pre-bid meeting. Questions Questions may only be submitted via NGEM. Questions must be submit, and will be responded to, via the Questions tab.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.