UNR - Replace All Interior Building Signage at Scrugham Engineering-Mines
Federal opportunity from BCN Purchasing. Place of performance: NV. Response deadline: Mar 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: Remove and replace existing interior signage with current UNR signage standards. UNR Project#: # 26MNC03528 Labor Commissioner #: WA-2026-240 SPWD Project #: Not Required Estimated Cost Range: $32,309 to $132,309 Liquidated Damages: $200 per day Special Considerations: All classrooms may have active classes, signage inside these spaces is minimal. Work can be managed without shutdown or area control. Parking permit will be required, parking space availability is limited. Verify preferred locations with UNR Parking and Transportation. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, and Workers' Compensation Insurance will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "April 2, 2026" and shall be fully complete by "June 30, 2026".
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.