Orwell WMA Wetland Restoration
Federal opportunity from Minnesota Department of Natural Resources • Department of Natural Resources. Place of performance: MN. Response deadline: Mar 24, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
State Project No. 2026-629-8W271 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition and Disposal 2. Earthwork and Grading 3. Berm and Embankment Construction 4. Seeding and Restoration C. DESCRIPTION OF ALTERNATES: This project does not include alternatives. D. DESCRIPTION OF UNIT PRICES: The Bid must be based upon the estimated quantities listed in the bid worksheet within the VirtuBid area of the Quest CDN plan room for this project. Responders must provide a unit price for each item described in the bid worksheet within the VirtuBid area of the QuestCDN plan room for this project. See subsection 1.14(C) Considerations of Responses of Section 00 21 23 Instructions to Responders for additional detail on how unit prices will be utilized under a Contract. If a responder discovers an error or needs additional clarification regarding the unit prices described in the bid worksheet described above, submit a question by the end of the question-and-answer period stated in Section 00 11 14 Solicitation Advertisement Information. See subsection 1.03(B) Examination of Site and Documents of Section 00 21 23 Instructions to Responders for additional detail. The contractor's completed bid worksheet will be incorporated into the final contract. E. DESCRIPTION OF ALLOWANCES: This project does not include allowances. All responses to this solicitation must be submitted and received in the Quest CDN Plan Room no later than 2:00pm on March 24, 2026. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.