Skip to content
Department of Transportation

609409 SPRINGFIELD FAP No. HIP(NGB)-003S(924) Bridge Replacement, S-24-016, Armory Street over CSX

Solicitation: Not available
Notice ID: ma_commbuys_a250dc4f439c6b313da3

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Mar 31, 2026. Industry: NAICS UNSPSC 72-14-11.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,040,194,774
Sector total $1,040,194,774 • Share 100.0%
Live
Median
$125,219
P10–P90
$31,848$958,240
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,040,194,774)
Deal sizing
$125,219 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260008 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +6
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Bricklayer/Cement Mason
Base $60.35Fringe $34.40
+98 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 98 more rate previews.
Davis-BaconBest fitstate match
MA20260008 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +6
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Bricklayer/Cement Mason
Base $60.35Fringe $34.40
Rate
BRICKLAYER
Base $58.21Fringe $33.71
+97 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260022 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Norfolk
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
POWER EQUIPMENT OPERATOR (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+6 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

More in NAICS UNSPSC 72-14-11

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 17, 2026
Executive summary

The opportunity involves the bridge replacement of S-24-016 over CSX on Armory Street as part of the Springfield FAP project, identified under the solicitation ID HIP(NGB)-003S(924). This project is set aside for small businesses (SBPP Eligible) and has a response deadline of February 18, 2026. Interested bidders should note that they cannot use COMMBUYS to submit bids for this project.

What the buyer is trying to do

The buyer is looking to replace the bridge S-24-016 on Armory Street over CSX, necessitating skilled contractors who can handle infrastructure projects within the designated deadlines and regulations set by the highway agency.

Work breakdown
  • Review project specifications from the provided resource link
  • Conduct site assessments and evaluations of existing bridge conditions
  • Prepare technical proposals and plans for bridge replacement
  • Develop a detailed project timeline and resource allocation
  • Prepare and submit bid proposal by the deadline
Response package checklist
  • Completed technical proposal including methodologies
  • Evidence of past performance and relevant project experience
  • Detailed pricing breakdown
  • Certifications to confirm SBPP eligibility
Suggested keywords
bridge replacementinfrastructuresmall businesshighway agencyconstruction bidding
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on specific engineering requirements for the bridge
  • Environmental assessments required for the project
  • Location details for the site comparison
  • Budget estimates or cap for the project
  • List of required licenses and certifications for bidders

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.