Skip to content
Department of Transportation

612056 ATTLEBORO-NORTH ATTLEBOROUGH-MANSFIELD-FOXBOROUGH Resurfacing and Related Work on I-95

Solicitation: Not available
Notice ID: ma_commbuys_9ec6cd212e5d1030902c

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Mar 03, 2026. Industry: NAICS UNSPSC 72-14-11.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,980,125,018
Sector total $2,980,125,018 • Share 100.0%
Live
Median
$158,160
P10–P90
$32,032$3,760,041
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,980,125,018)
Deal sizing
$158,160 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Massachusetts • Hampden
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
POWER EQUIPMENT OPERATOR Group 1
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Middlesex
ELECTRICIAN
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match
Published Jan 02, 2026
Massachusetts • Franklin
CARPENTER
Base: $43.33 • Fringe: $27.82
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base: $42.88 • Fringe: $31.04
A (1) Loader
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Suffolk
ELECTRICIAN (Includes Traffic Signalization)
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

More in NAICS UNSPSC 72-14-11

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Executive summary

The project involves resurfacing and related work on I-95 across Attleboro, North Attleborough, Mansfield, and Foxborough, with a response deadline set for February 24, 2026. This opportunity is open to Small Business Program Participants (SBPP Eligible), which signifies potentially broader support for smaller contractors. The work will likely require compliance with relevant highway safety and environmental regulations.

What the buyer is trying to do

The buyer aims to contract a qualified firm to perform resurfacing and associated work on I-95, improving roadway safety and infrastructure in the specified areas.

Work breakdown
  • Site assessment and preparation
  • Resurfacing of I-95
  • Installation of road markings and signage
  • Traffic management during construction
  • Post-project evaluation and reporting
Response package checklist
  • Evidence of SBPP eligibility
  • Relevant project experience documentation
  • Proposed work schedule
  • Detailed pricing proposal
  • Safety and compliance plans
Suggested keywords
I-95 resurfacingHighway constructionSBPProadway safetygovernment contracts
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed cost estimation guidelines
  • Specific agency contact for further inquiries
  • Full scope of required environmental assessments
  • Identification of local compliance requirements
  • Information on existing road conditions before starting work
  • Details on subcontracting limits if applicable
  • Clarification on payment schedules and terms
  • Any special materials or techniques required

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.