Skip to content
Department of Transportation

Rail: Cape Main Culverts Replacement at MP 63.22 Sandwich MA

Solicitation: Not available
Notice ID: ma_commbuys_8a3bcc6f37b3c1e2df9b

Federal opportunity from 0T100 - RAIL AND TRANSIT • Department of Transportation. Place of performance: MA. Response deadline: Feb 20, 2026. Industry: NAICS UNSPSC 95-12-16, 72-14-00, 72-15-00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$546,655,675
Sector total $546,655,675 • Share 100.0%
Live
Median
$97,181
P10–P90
$33,967$992,402
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($546,655,675)
Deal sizing
$97,181 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
MONICA AUGUSTE 10 PARK PPAZA Suite 3720 BOSTON, MA 02116 US Email: Monica.Auguste@dot.state.ma.us Phone: (857) 368-8984
State: MA
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0T100 - RAIL AND TRANSIT
Subagency
0T100 - RAIL AND TRANSIT
Office
Monica Auguste
Contracting Office Address
Not available

More in NAICS UNSPSC 95-12-16, 72-14-00, 72-15-00

Description

See bid documents It is strongly suggested that prospective Bidders have a representative attend this meeting/site walk.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Executive summary

This opportunity is for the replacement of culverts along the Cape Main Rail at milepost 63.22 in Sandwich, MA, as detailed in the bid documents. Prospective bidders are strongly encouraged to attend a pre-bid meeting and site walk to ensure understanding of project requirements. The response deadline for submission is set for February 20, 2026, making this a significant long-term contract opportunity for eligible small businesses.

What the buyer is trying to do

The agency aims to replace aging culverts to improve infrastructure stability and safety along the rail route.

Work breakdown
  • Review and analyze bid documents
  • Conduct a pre-bid site walk
  • Prepare and submit a comprehensive proposal
  • Plan for logistics and resource allocation
  • Ensure compliance with all local regulations
Response package checklist
  • Completed proposal form
  • Proof of SBPP eligibility
  • Detailed project plan and timeline
  • Cost estimate and pricing strategy
  • Safety and compliance certifications
Suggested keywords
Culvert replacementRail infrastructureErosion controlCivil engineeringSmall business set-aside
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific dates for the pre-bid meeting
  • Exact location for the site walk
  • Details on funding sources for this project
  • Scope of warranty or maintenance required post-completion

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.