Rice Corner Cross Road Culvert Replacement
Federal opportunity from HWY01 - Brookfield Highway Department • Town of Brookfield. Place of performance: MA. Response deadline: Mar 04, 2026. Industry: NAICS UNSPSC 72-14-10.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 72-14-10
Description
Project includes the removal of the existing pipe, installation of the proposed 12ft. WIDE 10ft. DEEP ID 3-sided box culvert, wingwalls, associated work and all materials necessary to backfill, pave and complete work shown on the Contract Drawings.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Brookfield Highway Department is soliciting bids for the Rice Corner Cross Road Culvert Replacement, which involves the removal of an existing pipe and installation of a new 12ft wide by 10ft deep ID 3-sided box culvert. This project includes wingwalls and all necessary materials for backfilling and paving completion. The deadline for submission is March 4, 2026, providing a substantial timeline for preparation and execution.
The buyer is looking to replace an existing culvert with a new structure that meets specified design requirements and standards as illustrated in the contract drawings.
- Removal of existing pipe
- Installation of 12ft wide 10ft deep ID 3-sided box culvert
- Construction of wingwalls
- Backfilling and paving
- Completion of work as per contract drawings
- Completed bid form
- Technical proposal detailing the approach and timeline
- Cost proposal with itemized breakdown
- Evidence of relevant past project experience
- Capacity to meet material supply needs and timelines
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific project budget provided
- No details on the evaluation criteria for bids
- No information on required bonding or insurance
- No details on site access or restrictions for contractors
- Contract drawings not available in the description
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.