Skip to content
Department of Transportation

612050 BRAINTREE-WEYMOUTH FAP No. NHP(NHS)-003S(923)X Resurfacing and Related Work on Route 3

Solicitation: Not available
Notice ID: ma_commbuys_b91b2a252c1e89894016

Federal opportunity from 0H100 - HIGHWAY • Department of Transportation. Place of performance: MA. Response deadline: Feb 18, 2026. Industry: NAICS 72, 14, 10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Construction Unit 10 Park Plaza Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0H100 - HIGHWAY
Subagency
0H100 - HIGHWAY
Office
Alex Deng
Contracting Office Address
Not available

Description

Do Not Use COMMBUYS to Bid on this Project

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity titled '612050 BRAINTREE-WEYMOUTH FAP No. NHP(NHS)-003S(923)X Resurfacing and Related Work on Route 3' involves resurfacing and related works in the Braintree-Weymouth area, under the oversight of the Highway Agency. The response deadline for submissions is set for February 18, 2026. This project is SBPP eligible, making it a favorable bid for small businesses.

BraintreeWeymouthresurfacinghighwaysmall businessroad work
What the buyer is trying to do

The buyer aims to engage contractors for resurfacing and related road work along Route 3, ensuring improved road conditions and safety.

Who should pursue this
  • Small businesses with experience in road construction and resurfacing
  • Contractors familiar with highway work standards
  • Firms with a track record of compliance with governmental regulations
Work breakdown
  • Site assessment and preparation
  • Asphalt resurfacing
  • Traffic management plan development
  • Post-construction quality evaluation
Response package checklist
  • Completed bid forms
  • Proof of eligibility for SBPP
  • Relevant past project references
  • Safety and compliance documentation
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to state and federal regulations for roadwork
  • Compliance with SBPP eligibility requirements
Pricing strategy
  • Competitive pricing based on market analysis for similar projects
  • Consideration of cost-effective materials and methods
Teaming and subs
  • Partnerships with local subcontractors for specialized work (e.g., traffic management)
  • Collaboration with environmental consultants for compliance requirements
Risks and watchouts
  • Potential delays due to weather conditions affecting the construction schedule
  • Regulatory compliance risks regarding environmental impacts
  • Fluctuations in material costs
Smart questions to ask
  • What are the specific requirements for material quality?
  • Are there any anticipated utility conflicts during construction?
  • What is the expected traffic impact during the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work documents
  • Specific materials required
  • Full contact details for the buyer
  • Regular updates on project timelines
  • Information on existing road conditions to assess work extent

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.