Skip to content
City of Salem

26-47-FIR Fire Dept Staffing Study

Solicitation: Not available
Notice ID: ma_commbuys_3351535d4491f5ef7df1
NAICS UNSPSC 80-10-00DepartmentCity of SalemAgencyCOSPD - PurchasingStateMAPostedDueMar 12, 2026, 11:00 AM UTCCloses in 0 days

Federal opportunity from COSPD - Purchasing • City of Salem. Place of performance: MA. Response deadline: Mar 12, 2026. Industry: NAICS UNSPSC 80-10-00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Anthony P. Delaney 93 Washington Street Salem, MA 01970 US Email: adelaney@salem.com Phone: (978) 619-5696 FAX: (978) 745-7461
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260009 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match
MA20260009 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Marble & Tile Finisher
Base $49.32Fringe $35.26
Rate
Marble, Tile & Terrazzo Workers
Base $64.52Fringe $37.51
+45 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260021 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Middlesex
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Salem
Agency
COSPD - Purchasing
Subagency
COSPD - Purchasing
Office
Anthony Delaney
Contracting Office Address
Not available

More in NAICS UNSPSC 80-10-00

Description

Fire Department Staffing Study

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Executive summary

The COSPD Purchasing agency is seeking proposals for a Fire Department Staffing Study, aimed at assessing current staffing needs and operational efficiencies in fire services. The response deadline is set for March 12, 2026, providing ample time for bidders to prepare comprehensive proposals. This opportunity aligns with NAICS UNSPSC 80-10-00, indicating a focus on professional services related to public safety and emergency management.

What the buyer is trying to do

The buyer is looking to conduct a detailed study of the current staffing levels and operational requirements of the Fire Department, with the goal of optimizing their workforce and ensuring effective service delivery.

Work breakdown
  • Conduct a comprehensive analysis of current staffing levels.
  • Evaluate operational efficiencies within the Fire Department.
  • Provide strategic recommendations for staffing improvements.
Response package checklist
  • Company profile and experience in public safety studies.
  • Detailed methodology for conducting the staffing study.
  • Proposed timeline and milestones for project completion.
Suggested keywords
Fire DepartmentStaffing StudyPublic SafetyConsultingWorkforce Optimization
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on the expected deliverables after the staffing study is completed.
  • Any specific methodologies the buyer prefers for the study.
  • Clarification on whether there are existing challenges to be aware of.
  • Information about the budget range or funding sources for the study.
  • Details on data access procedures for the Fire Department operations.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.