Skip to content
Department of Transportation

2027FreightPlan

Solicitation: Not available
Notice ID: ma_commbuys_297b46a6f39bd1e4e0c2

Federal opportunity from 0P100MHDOFFOFSCTY - Office of the Secretary • Department of Transportation. Place of performance: MA. Response deadline: Apr 21, 2026. Industry: NAICS 80, 10, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Office of Secretary of MassDOT 10 Park Plaza Room 4160 Boston, MA 02116 US Email: Noname@state.ma.us Phone: (999) 999-9999
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260010 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match
MA20260010 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire, Franklin, Hampden +1
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
Rate
DIVER TENDER
Base $61.70Fringe $35.47
+63 more occupation rates in this WD
Davis-Baconstate match
MA20260011 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)
Base $44.36Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS
Base $50.81Fringe $32.27
+54 more occupation rates in this WD
Davis-Baconstate match
MA20260019 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampden
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
0P100MHDOFFOFSCTY - Office of the Secretary
Subagency
0P100MHDOFFOFSCTY - Office of the Secretary
Office
Nathaniel Kerr
Contracting Office Address
Not available

Description

2027FreightPlan

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 28, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The 2027 Freight Plan opportunity, posted by the Office of the Secretary, seeks proposals to address strategic freight management. The response deadline is April 21, 2026, allowing adequate preparation time for potential bidders. This project, classified under UNSPSC 80-10-00, emphasizes the importance of efficient freight strategies in future urban planning.

freight planningtransportation efficiencyurban logisticssupply chain management2027 Freight Plan
What the buyer is trying to do

The buyer aims to develop a comprehensive freight plan that enhances logistics and transportation efficiency for upcoming projects in 2027.

Who should pursue this
  • Consulting firms specializing in transportation and logistics
  • Urban planners with expertise in freight management
  • Engineering firms experienced in infrastructure planning
Work breakdown
  • Conduct a thorough analysis of current freight systems
  • Identify key stakeholders and gather their input
  • Develop strategic recommendations for improved freight logistics
  • Create an implementation timeline and budget estimation
  • Prepare a final report with actionable insights
Response package checklist
  • Cover letter
  • Technical proposal addressing the scope of work
  • Budget proposal detailing estimated costs
  • Team qualifications and relevant experience
  • Timeline for project completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with local and federal guidelines on transportation
  • Adhere to any specific formatting requirements set forth in the attachments
Pricing strategy
  • Consider competitive pricing to differentiate from other bidders
  • Include a detailed breakdown of costs associated with each phase of the project
Teaming and subs
  • Partner with local transportation experts
  • Consider joint ventures with firms experienced in similar projects
Risks and watchouts
  • Potential delays in stakeholder feedback could impact timelines
  • Changes in regulations may affect project scope
  • Budget overruns due to unforeseen challenges in data collection
Smart questions to ask
  • What specific outcomes are expected from the freight plan?
  • Are there particular data sources or research materials the buyer prefers?
  • What stakeholders should be engaged during the planning process?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work not provided
  • Specific evaluation criteria for proposals not mentioned
  • Information on previous similar projects or benchmarks absent
  • No indication of available funding or budget limits
  • Lack of geographical focus for the freight plan
  • Startup requirements for teams or subs are unclear
  • No indication of specific stakeholder groups or contacts provided

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.