TRD01 INTERIOR LIGHT FIXTURE UPGRADE BROCKTON MSC
Federal opportunity from DMH05 - SOUTHEAST AREA • Department of Mental Health. Place of performance: MA. Response deadline: Apr 10, 2026. Industry: NAICS 72, 15.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 61 more rate previews.↓
Point of Contact
Agency & Office
Description
TRD01 Category 3: Electrician Services INTERIOR LIGHT FIXTURE UPGRADE BROCKTON MSC
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The TRD01 INTERIOR LIGHT FIXTURE UPGRADE project involves upgrading the lighting fixtures at the Brockton MSC, categorized under Electrician Services. This opportunity is posted by the Southeast Area of DMH and is set aside for SBPP eligible vendors. The response deadline for this bid is April 10, 2026, providing ample time for qualified contractors to prepare their proposals.
The buyer aims to upgrade the interior lighting fixtures at the Brockton Multi-Service Center, improving lighting quality and efficiency.
- Electrical contractors with experience in lighting upgrades
- Small businesses eligible for SBPP
- Contractors with previous projects in similar scopes
- Assess current lighting setup
- Design upgrade plan for fixtures
- Install new lighting fixtures
- Conduct post-installation quality checks
- Company profile including SBPP eligibility
- List of relevant experience and past projects
- Detailed project approach and timeline
- Safety plan for installation
- Pricing breakdown for materials and labor
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local electrical codes
- Adherence to safety regulations during installation
- Consider competitive pricing due to SBPP set-aside
- Include breakdown of costs for materials, labor, and overhead
- Potential partnerships with lighting manufacturers
- Subcontracting with certified electricians if not fully in-house
- Delays in material sourcing
- Compliance issues with local codes
- Potential changes in project scope that could impact pricing
- What specific lighting types are required for the upgrade?
- Are there any specific energy efficiency standards to meet?
- How will the performance of installation be evaluated?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific technical requirements for fixtures
- Budget range for the project
- Detailed scope of work document
- Timeline for project completion aside from bid deadline
- Location specifics for Brockton MSC
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.