Skip to content
Davis-Bacon

MA20260003 (Rev 0)

Coverage: Massachusetts • Berkshire, Franklin, Hampden +1.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)$44.36$36.63
BOILERMAKER$50.62$28.82
BRICKLAYER BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS$50.81$32.27
PILEDRIVERMAN$55.79$35.47
CARPENTER$43.33$27.82
Carpenter/Lather/Drywall Applicator$43.33$27.82
MILLWRIGHT$43.42$33.00
FLOOR LAYER: Carpet$43.23$27.79
ELECTRICIAN$52.16$29.56
Teledata System Installer$52.16$29.56
ELEVATOR MECHANIC$66.41$38.43
Power equipment operators: (BUILDING & RESIDENTIAL) Group 1$41.23$30.58
A Group 2$40.92$30.58
A Group 3$40.70$30.58
A Group 4$37.47$30.58
A Group 5$36.35$30.58
A Group 6$34.41$30.58
A Group 7$52.73$30.58
A Group 8$42.41$30.58
A Group 9$42.72$30.58
A Group 10$44.73$30.58
A Group 11$45.73$30.58
A Group 12$47.23$30.58
A Group 13$48.23$30.58
A Group 14$49.23$30.58
A Group 15$50.73$30.58
IRONWORKER$41.89$33.90
IRONWORKER$40.75$31.91
Ironworkers: Sheeter$41.00$31.91
Structural, Ornamental, Reinforcing, Fence Erector, Machinery Mover, Rigger, Rodman, Stone Derrickman$40.75$31.91
Laborers: GROUP 1$38.95$29.70
GROUP 2$39.20$29.70
GROUP 3$39.70$29.70
GROUP 4$39.95$29.70
GROUP 5$39.70$29.70
GROUP 6$40.95$29.70
Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)$46.20$29.70
Laborers$31.54$25.63
Laborers: GROUP 1$35.00$28.87
GROUP 2$35.25$28.87
GROUP 3$35.75$28.87
GROUP 4$35.75$28.87
GROUP 5$36.00$28.87
MARBLE FINISHER$28.43$25.85
GLAZIER$43.13$21.00
PAINTER NEW CONSTRUCTION: Brush, Taper$38.08$31.95
Spray, Sandblast$39.48$31.95
REPAINT: Brush, Taper$35.40$31.95
Spray, Sandblast$36.80$31.95
Plumber and Steamfitter$55.00$31.57
Plumbers and Pipefitters$52.26$31.05
Plumber and Steamfitter$52.26$31.05
Roofers: Composition Roofers & Damp Waterproofers$42.48$30.14
Pitch,Slate, Tile and Precast Concrete$42.48$30.14
SPRINKLER FITTER$64.85$40.76
Sheet metal worker$43.48$36.46
Truck drivers: Group 1$40.78$37.35
b Group 2$40.95$37.35
b Group 3$41.02$37.35
b Group 4$41.14$37.35
b Group 5$41.24$37.35
b Group 6$41.53$37.35
b Group 7$41.82$37.35

Related Wage Determinations

View directory →