Toilet Fixture Replacement - Institute Park / DPRC
Federal opportunity from PUR001 - Purchasing Department • City of Worcester. Place of performance: MA. Response deadline: Mar 25, 2026. Industry: NAICS 72, 13, 00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 23 more rate previews.↓
Point of Contact
Agency & Office
Description
Toilet Fixture Replacement - Institute Park / DPRC, Bid #: 8648-J6, Bid documents available on our open bids page via our website @ www.worcesterma.gov
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity involves the replacement of toilet fixtures at Institute Park / DPRC, with bid number 8648-J6. The buyer is the Purchasing Department and the response deadline is set for March 25, 2026. Relevant bid documents are available on the Worcester website, indicating a need for potential bidders to access these resources for detailed requirements.
The buyer is looking to procure services for the replacement of toilet fixtures at the specified location, focusing on quality and timely delivery as articulated in the bid documents.
- Contractors with experience in facility renovation
- Firms specializing in plumbing and restroom fixture installation
- Businesses located in or near Worcester for logistical convenience
- Review bid documents available on the Worcester website
- Conduct site assessments if needed
- Prepare technical and pricing proposals
- Submit proposals by the stated deadline
- Ensure compliance with all local codes and standards
- Completed bid proposal form
- Detailed pricing breakdown
- Proof of prior relevant experience
- Copies of certifications and licenses
- Timeline for project completion
- All work must meet local building codes
- Bidder must verify that all materials are compliant with environmental regulations
- Consider competitive pricing strategies based on local market
- Offer package deals for multiple fixture replacements, if applicable
- Partner with local plumbing specialists
- Engage subcontractors for labor resources if needed
- Potential delays in material procurement
- The need for unforeseen repair work upon fixture removal
- Bidder might face competition from established local contractors
- What are the specific types of toilet fixtures required?
- Are there any preferences for sustainable materials or products?
- What are the expected project milestones and penalties for delay?
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific requirements detailed in the bid documents
- Lack of information on existing infrastructure conditions
- Absence of a pre-bid meeting schedule
- No procurement strategy mentioned
- Unclear bidding process requirements
- Limited timeframe for site access operations
- Missing details on warranty or maintenance requirements
- No delineation of potential penalties for non-compliance
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.