Skip to content
City of Worcester

Toilet Fixture Replacement - Institute Park / DPRC

Solicitation: Not available
Notice ID: ma_commbuys_073b90eb512559ce0dd3
NAICS 72, 13, 00DepartmentCity of WorcesterAgencyPUR001 - Purchasing DepartmentStateMAPostedDueMar 25, 2026, 10:00 AM UTCCloses in 12 days

Federal opportunity from PUR001 - Purchasing Department • City of Worcester. Place of performance: MA. Response deadline: Mar 25, 2026. Industry: NAICS 72, 13, 00.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$528,851,692
Sector total $528,851,692 • Share 100.0%
Live
Median
$208,477
P10–P90
$30,375$1,458,607
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($528,851,692)
Deal sizing
$208,477 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Chris Gagliastro 455 Main Street Room 201 Worcester, MA 01608 US Email: purchasing@worcesterma.gov Phone: (508) 799-1220
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260015 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $50.02Fringe $31.09
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+23 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 23 more rate previews.
Davis-BaconBest fitstate match
MA20260015 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable
Rate
ELECTRICIAN (Includes Traffic Signalization)
Base $50.02Fringe $31.09
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260021 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Middlesex
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260013 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Worcester
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base $49.10Fringe $36.63
Rate
TILE FINISHER
Base $49.32Fringe $35.26
Rate
TILE SETTER
Base $64.52Fringe $37.51
+14 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Worcester
Agency
PUR001 - Purchasing Department
Subagency
PUR001 - Purchasing Department
Office
Jerry Kucera
Contracting Office Address
Not available

Description

Toilet Fixture Replacement - Institute Park / DPRC, Bid #: 8648-J6, Bid documents available on our open bids page via our website @ www.worcesterma.gov

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 07, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This opportunity involves the replacement of toilet fixtures at Institute Park / DPRC, with bid number 8648-J6. The buyer is the Purchasing Department and the response deadline is set for March 25, 2026. Relevant bid documents are available on the Worcester website, indicating a need for potential bidders to access these resources for detailed requirements.

Toilet Fixture ReplacementWorcester Public WorksPlumbing ServicesFacility Renovation
What the buyer is trying to do

The buyer is looking to procure services for the replacement of toilet fixtures at the specified location, focusing on quality and timely delivery as articulated in the bid documents.

Who should pursue this
  • Contractors with experience in facility renovation
  • Firms specializing in plumbing and restroom fixture installation
  • Businesses located in or near Worcester for logistical convenience
Work breakdown
  • Review bid documents available on the Worcester website
  • Conduct site assessments if needed
  • Prepare technical and pricing proposals
  • Submit proposals by the stated deadline
  • Ensure compliance with all local codes and standards
Response package checklist
  • Completed bid proposal form
  • Detailed pricing breakdown
  • Proof of prior relevant experience
  • Copies of certifications and licenses
  • Timeline for project completion
Compliance notes
  • All work must meet local building codes
  • Bidder must verify that all materials are compliant with environmental regulations
Pricing strategy
  • Consider competitive pricing strategies based on local market
  • Offer package deals for multiple fixture replacements, if applicable
Teaming and subs
  • Partner with local plumbing specialists
  • Engage subcontractors for labor resources if needed
Risks and watchouts
  • Potential delays in material procurement
  • The need for unforeseen repair work upon fixture removal
  • Bidder might face competition from established local contractors
Smart questions to ask
  • What are the specific types of toilet fixtures required?
  • Are there any preferences for sustainable materials or products?
  • What are the expected project milestones and penalties for delay?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific requirements detailed in the bid documents
  • Lack of information on existing infrastructure conditions
  • Absence of a pre-bid meeting schedule
  • No procurement strategy mentioned
  • Unclear bidding process requirements
  • Limited timeframe for site access operations
  • Missing details on warranty or maintenance requirements
  • No delineation of potential penalties for non-compliance

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.