Skip to content
Davis-Bacon

MA20260015 (Rev 0)

Coverage: Massachusetts • Barnstable.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ELECTRICIAN (Includes Traffic Signalization)$50.02$31.09
POWER EQUIPMENT OPERATOR Group 1$57.83$33.70
Group 2$57.18$33.70
IRONWORKER (ORNAMENTAL AND STRUCTURAL)$57.87$37.67
LABORER (Concrete Surfacer)$46.20$29.85
LABORER Common or General$38.95$29.41
Fence Erection$38.95$29.41
LABORER (Landscape)$38.95$29.41
LABORER Guardrail Installation$35.00$26.91
PAINTER (Steel)$56.76$36.00
TRUCK DRIVER (Dump Truck)$40.78$37.35
CARPENTER, Includes Form Work$43.64$22.09
CEMENT MASON/CONCRETE FINISHER$56.70$21.08
IRONWORKER, REINFORCING$44.52$19.36
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor$33.65$17.32
LABORER: Concrete Saw (Hand Held/Walk Behind)$44.43$14.18
LABORER: Jack Hammer$38.69$17.33
OPERATOR: Forklift$64.67$0.00
OPERATOR: Mechanic$48.74$11.79
OPERATOR: Piledriver$42.56$17.34
PAINTER: Spray (Linestriping)$47.30$6.42
TRAFFIC CONTROL: Flagger$23.00$20.44
TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper$53.35$12.78
TRUCK DRIVER: Concrete Truck$33.69$15.79
TRUCK DRIVER: Flatbed Truck$48.53$0.00

Related Wage Determinations

View directory →