Skip to content
Town of Fairhaven

Glenhaven Avenue Water Main Replacement

Solicitation: Not available
Notice ID: ma_commbuys_06a652292e5f63dad2af
NAICS UNSPSC 72-14-10DepartmentTown of FairhavenAgency1267CONVD - Fairhaven Board of Public WorksStateMAPostedDueMar 20, 2026, 10:00 AM UTCCloses in 16 days

Federal opportunity from 1267CONVD - Fairhaven Board of Public Works • Town of Fairhaven. Place of performance: MA. Response deadline: Mar 20, 2026. Industry: NAICS UNSPSC 72-14-10.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,261,759,290
Sector total $3,261,759,290 • Share 100.0%
Live
Median
$275,770
P10–P90
$32,298$4,646,416
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,261,759,290)
Deal sizing
$275,770 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for MA
Live POP
Place of performance
Rebecca Vento 5 Arsene Street Fairhaven, MA 02719 US Email: rvento@fairhaven-ma.gov Phone: (508) 979-4030 FAX: (508) 979-4086 Website: http://fairhaven-ma.gov/Pages/FairhavenMA_Highway/Index
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Massachusetts • Hampden
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
POWER EQUIPMENT OPERATOR Group 1
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Middlesex
ELECTRICIAN
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match
Published Jan 02, 2026
Massachusetts • Franklin
CARPENTER
Base: $43.33 • Fringe: $27.82
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base: $42.88 • Fringe: $31.04
A (1) Loader
Base: $42.88 • Fringe: $31.04
Match signal: state match
Published Jan 02, 2026
Massachusetts • Suffolk
ELECTRICIAN (Includes Traffic Signalization)
Base: $66.17 • Fringe: $37.08
POWER EQUIPMENT OPERATOR Group 1
Base: $57.83 • Fringe: $33.70
Group 2
Base: $57.18 • Fringe: $33.70
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Town of Fairhaven
Agency
1267CONVD - Fairhaven Board of Public Works
Subagency
1267CONVD - Fairhaven Board of Public Works
Office
Rebecca Vento
Contracting Office Address
Not available

More in NAICS UNSPSC 72-14-10

Description

The water main improvements involve installing approximately 2,700 linear feet of 8" and 6" water pipes, water services, hydrants, 8"x8" tapping sleeve valve, temporary and permanent trench paving, temporary water bypass system and abandoning the existing water main on Glenhaven Avenue.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 04, 2026
Executive summary

The Glenhaven Avenue Water Main Replacement project involves significant infrastructure improvements, including the installation of approximately 2,700 linear feet of new water pipes. This project is managed by the Fairhaven Board of Public Works and aims to enhance water service reliability in the area. Bidders must prepare to address both temporary and permanent solutions, including a temporary water bypass system and trench paving.

What the buyer is trying to do

The Fairhaven Board of Public Works seeks to replace the existing water main on Glenhaven Avenue to improve water service quality and reliability for residents.

Work breakdown
  • Install approximately 2,700 linear feet of 8" and 6" water pipes
  • Install water services and hydrants
  • Install 8"x8" tapping sleeve valve
  • Conduct temporary and permanent trench paving
  • Establish a temporary water bypass system
  • Abandon the existing water main
Response package checklist
  • Company profile and experience
  • Detailed project approach
  • Timing and availability of resources
  • Cost proposal
  • Safety and quality control measures
Suggested keywords
water main replacementinfrastructure improvementmunicipal projectswater servicesconstruction bidding
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific contractor experience requirements stated
  • No information on available funding or budget constraints
  • Details on project milestones or deadlines are limited
  • No environmental impact study information provided
  • No historical data on previous water main projects in the area available
  • No contact information for pre-bid inquiries included
  • No details on the bid evaluation criteria provided
  • Lack of clarity on warranty or post-completion service expectations

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.