Replacement of Pumps 1 & 4 at the Tewksbury WTP Raw Water Intake Station
Federal opportunity from TKDPW - Department of Public Works • Town of Tewksbury. Place of performance: MA. Response deadline: Mar 12, 2026. Industry: NAICS UNSPSC 47-10-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 47-10-00
Description
The work includes the removal and replacement of Pump Nos. 1 & 4 at the raw water intake station for the Tewksbury Water Treatment Plant (WTP), including the existing variable frequency drives (VFDs) associated with each pump.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.