Transmission Main and Water Main upgrade
Federal opportunity from CWD01 - Chelmsford Water District • Chelmsford Water District. Place of performance: MA. Response deadline: Mar 11, 2026. Industry: NAICS UNSPSC 47-10-00.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS UNSPSC 47-10-00
Description
The project involves furnishing and installing approx. 3,700 feet of 8-inch ductile iron (DI) Water main, installing approximately 40 water services. Water service by-pass piping will also be required. The Work will also include furnishing and installing approx. 1,100 feet of 10-inch DI Transmission main and approximately 7,600 linear feet of 10-inch high-density polyethylene transmission main. The work also included the modification of the Davis Street Valve vault. The total time period for
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Chelmsford Water District is seeking contractors for a significant water main upgrade project, involving the installation of approximately 3,700 feet of 8-inch ductile iron water main and about 1,100 feet of 10-inch ductile iron transmission main. The work also necessitates 40 water service installations and modifications to the Davis Street Valve vault. Interested bidders must be prepared to address the specified requirements by the response deadline of March 11, 2026.
The Chelmsford Water District aims to enhance its water distribution infrastructure through the installation of new water mains and services, which will improve water service reliability and capacity for the community.
- Furnish and install 3,700 feet of 8-inch ductile iron water main
- Install approximately 40 water services
- Install 1,100 feet of 10-inch ductile iron transmission main
- Install approximately 7,600 linear feet of 10-inch high-density polyethylene transmission main
- Modify Davis Street Valve vault
- Bid proposal detailing scope of work
- Company qualifications and relevant experience
- Safety and compliance documentation
- Pricing structure and estimated costs
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No estimated budget provided
- Details on existing infrastructure conditions are missing
- Lack of information regarding previous projects of similar scope
- Required certifications for contractors not specified
- No specific timeline for project milestones mentioned
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.