Skip to content
Town of Oxford

Wheelock Street Roadway and Pedestrian Improvements

Solicitation: Not available
Notice ID: ma_commbuys_5d5008858874098cc1bd
NAICS 30, 12, 00DepartmentTown of OxfordAgencyDpw12 - DpwStateMAPostedDueMay 07, 2026, 02:00 PM UTCCloses in 20 days

Federal opportunity from DPW12 - DPW • Town of Oxford. Place of performance: MA. Response deadline: May 07, 2026. Industry: NAICS 30, 12, 00.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Kevin Duffy 450 Main Street Oxford, MA 01540 US Email: kduffy@oxfordma.us Phone: (508) 987-6006
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260001 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
+97 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 97 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
Rate
ATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)
Base $55.45Fringe $36.63
+96 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Oxford
Agency
DPW12 - DPW
Subagency
DPW12 - DPW
Office
Kevin Duffy
Contracting Office Address
Not available

Description

Bid document is available to download @ https://www.oxfordma.us/Bids.aspx The Work consists of roadway and sidewalk improvements on Wheelock Street, Wheelock Court, and Fairlawn Avenue

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity for roadway and pedestrian improvements on Wheelock Street, Wheelock Court, and Fairlawn Avenue is available. The response deadline for submissions is set for May 7, 2026. This project is managed by the Department of Public Works and invites bids from qualified contractors.

roadway improvementspedestrian enhancementsmunicipal constructionpublic works
What the buyer is trying to do

The DPW aims to enhance roadway and sidewalk conditions on specific streets to improve safety and accessibility for pedestrians.

Who should pursue this
  • General contractors specializing in roadway construction
  • Civil engineering firms with experience in municipal projects
  • Landscaping contractors familiar with urban environments
Work breakdown
  • Roadway improvements on Wheelock Street
  • Sidewalk enhancements on Wheelock Court
  • Improvements on Fairlawn Avenue
Response package checklist
  • Completed Bid Form
  • Proof of relevant experience
  • Project timeline and milestones
  • Cost proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local construction guidelines
  • Confirm bidder qualifications as per municipal standards
Pricing strategy
  • Consider a competitive pricing model due to potential for multiple bidders
  • Analyze local market rates for similar projects
Teaming and subs
  • Subcontracting opportunities for specialized trades such as landscaping or drainage
  • Partnering with local firms for enhanced insight into community needs
Risks and watchouts
  • Potential construction delays due to weather
  • Community resistance to construction activities
  • Supply chain issues affecting materials availability
Smart questions to ask
  • What is the budget range allocated for this project?
  • Are there specific materials or techniques preferred by the DPW?
  • Will community feedback be solicited during the planning phase?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget or funding details
  • Exact start and end dates for the project
  • Number of bidders expected
  • Details on community engagement plans
  • Information about any required permits
  • Specifications for materials and design
  • Assessment criteria for bids
  • Potential environmental impact considerations

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.