Coverage: Massachusetts • Barnstable, Bristol, Dukes +5.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)$55.45$36.63
ZONE B)$55.45$36.63
ATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)$55.45$36.63
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)$55.45$36.63
BOILERMAKER$50.62$28.82
Bricklayer, Cement Mason, Plasterer$60.26$33.71
Bricklayer and plasterer$60.26$33.71
BRICKLAYER$60.26$33.71
Marble & Tile Finisher$49.32$35.26
Marble, Tile & Terrazzo Workers$64.52$37.51
TERRAZZO FINISHER$63.44$37.33
BRICKLAYER$64.50$37.54
Bricklayer, cement mason and plasterer$64.50$37.54
Bricklayer and plasterer$64.50$37.54
PILEDRIVERMAN$55.79$35.47
PILEDRIVERMAN$49.19$35.47
CARPENTER$61.19$31.55
CARPENTER$50.10$31.45
CARPENTER$46.43$28.35
CARPENTER$39.28$27.90
MILLWRIGHT$50.47$33.50
MILLWRIGHT$45.03$33.25
FLOOR LAYER: Carpet$57.49$31.75
FLOOR LAYER: Carpet$49.18$31.75
ELECTRICIAN$48.16$36.20
Teledata System Installer$36.12$34.51
ELECTRICIAN$56.11$44.10
Teledata System Installer$42.09$10.45
Teledata System Installer$52.94$34.74
ELECTRICIAN$66.17$37.08
Line Construction: Cableman$58.41$30.19
A Equipment Operator$49.65$26.72
A Groundman$32.13$12.70
A Lineman$58.41$30.19
ELECTRICIAN$50.02$31.09
Teledata System Installer$42.52$31.09
ELEVATOR MECHANIC$74.17$38.43
Power equipment operators: Group 1$57.83$33.70
Group 2$57.18$33.70
Group 3$37.02$33.70
Group 4$46.52$33.70
Group 5$25.02$33.70
Group 6$30.85$33.70
Ironworkers: AREA 1$57.87$37.67
AREA 2$53.46$37.67
IRONWORKER$57.57$37.67
IRONWORKER$43.03$33.53
Laborers: (HEAVY CONSTRUCTION) GROUP 1$38.95$29.70
GROUP 2$39.20$29.70
GROUP 3$39.70$29.70
GROUP 4$39.95$29.70
GROUP 5$39.70$29.70
GROUP 6$40.95$29.70
Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)$46.20$29.70
Plasterer tender$38.95$29.70
Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)$46.10$29.70
Laborers: GROUP 1$46.10$29.70
GROUP 2$46.10$29.70
GROUP 3$46.10$29.70
GROUP 4$46.10$29.70
GROUP 5$46.10$29.70
GROUP 6$46.10$29.70
GROUP 7$27.01$29.70
Laborers: GROUP 1$38.95$29.70
GROUP 2$38.95$29.70
GROUP 3$38.95$29.70
GROUP 4$38.95$29.70
GROUP 5$38.95$29.70
Laborers: (Wrecking) Group 1$46.25$29.70
Group 2$47.00$29.70
Group 3$47.25$29.70
Group 4$42.25$29.70
Group 5$45.35$29.70
Group 6$46.25$29.70
GLAZIER$43.13$21.00
PAINTER NEW CONSTRUCTION: Brush, Taper$46.26$36.00
Spray, Sandblast$47.66$36.00
REPAINT: Brush, Taper$44.32$36.00
Spray, Sandblast$45.72$36.00
GLAZIER$46.26$36.00
CEMENT MASON/CONCRETE FINISHER$49.19$40.86
PLASTERER$49.19$40.86
Plumbers and Pipefitters$55.00$31.57
PLUMBER$69.84$36.43
Plumbers and Pipefitters$52.49$33.60
PIPEFITTER$66.58$39.22
Roofers: All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid$53.53$35.69
SPRINKLER FITTER$72.05$40.76
SPRINKLER FITTER$64.85$40.76
SPRINKLER FITTER$53.25$29.75
Sheet metal worker$60.00$48.78
Sheet metal worker$42.80$38.17
Truck drivers: Group 1$40.78$37.35
b Group 2$40.95$37.35
b Group 3$41.02$37.35
b Group 4$41.14$37.35
b Group 5$41.24$37.35
b Group 6$41.53$37.35
b Group 7$41.82$37.35