Oxford Highschool Asphalt Roof Replacement
Federal opportunity from DPW12 - DPW • Town of Oxford. Place of performance: MA. Response deadline: Mar 12, 2026. Industry: NAICS 72, 13, 00.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 97 more rate previews.↓
Point of Contact
Agency & Office
Description
Roof Replacement Project Available for download at https://www.oxfordma.us/Bids.aspx
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Oxford Highschool Asphalt Roof Replacement project is managed by DPW12 - DPW. The response deadline for bids is set for March 12, 2026. This project is categorized under UNSPSC 72-13-00, focusing on roofing services.
The buyer aims to replace the asphalt roof at Oxford Highschool, ensuring longevity and compliance with relevant building standards.
- Contractors specializing in roofing services
- Local construction firms with experience in school projects
- Companies with a proven track record in timely project completions
- Review existing roof conditions
- Prepare a roofing replacement plan
- Removal of existing asphalt roof
- Installation of new asphalt roofing
- Final inspection and quality assurance checks
- Completed bid form
- Proof of prior roofing experience
- Company qualifications and references
- Cost estimate and pricing details
- Project timeline proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to local building codes
- Compliance with safety regulations during construction
- Consider competitive pricing due to a public bid
- Include cost for materials and labor breakdown
- Roofing material suppliers
- Engineering consultants for structural assessment
- Potential for underestimation of costs due to material price fluctuations
- Delays in obtaining necessary permits
- Weather-related delays during installation
- What are the specific requirements for material specifications?
- Are there any existing warranties on the current roof that may influence new installation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No detailed scope of the existing roof conditions provided
- No specific budget range for the project mentioned
- Absence of required qualifications or certifications for bidders
- Lack of information on site access and logistics
- No details on required maintenance post-installation
- Unclear if there are stormwater management considerations
- Not specified if there are any historical preservation requirements for the building
- No insight into potential disruption to school activities during construction
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.