Skip to content
Town of Orleans

IFB: Municipal Fiber Network Project

Solicitation: Not available
Notice ID: ma_commbuys_d3d31dfb0d9de2fd4780
DepartmentTown of OrleansAgencyTAO01 - Town of OrleansStateMAPostedDueMar 13, 2026, 02:00 PM UTCExpired

Federal opportunity from TAO01 - Town of Orleans • Town of Orleans. Place of performance: MA. Response deadline: Mar 13, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,275,750,127
Sector total $2,275,750,127 • Share 100.0%
Live
Median
$146,315
P10–P90
$27,574$1,433,570
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,275,750,127)
Deal sizing
$146,315 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for MA
Live POP
Place of performance
Kimberly Newman 19 School Road Orleans, MA 02653 US Email: knewman@town.orleans.ma.us Phone: (508) 240-3700 Ext. 2415 FAX: (508) 240-3703
State: MA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260001 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
+97 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 97 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems (ZONE A)
Base $55.45Fringe $36.63
Rate
ZONE B)
Base $55.45Fringe $36.63
Rate
ATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)
Base $55.45Fringe $36.63
+96 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Plymouth
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260020 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Hampshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Town of Orleans
Agency
TAO01 - Town of Orleans
Subagency
TAO01 - Town of Orleans
Office
Kimberly Newman
Contracting Office Address
Not available

Description

IFB: Municipal Fiber Network Project - Project consists of the design incidental to construction, furnishing, installation, testing, and commissioning of municipal fiber optic infrastructure at multiple Town facilities. Bids must be received by the Town Managers office by March 13, 2026 at 2:00pm. Bid documents may be viewed by registering at www.town.orleans.ma.us/bids

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Town of Orleans is soliciting bids for the Municipal Fiber Network Project, which includes the design, installation, testing, and commissioning of fiber optic infrastructure at various town facilities. Bids are due by March 13, 2026, at 2:00 PM. Interested bidders must register at the town’s website to access bid documents, ensuring comprehensive project understanding and compliance with requirements.

fiber optic infrastructuremunicipal servicesinstallation and commissioningOrleans bidstelecommunication systems
What the buyer is trying to do

The Town of Orleans aims to enhance its municipal services by implementing a fiber optic network, facilitating better connectivity across town facilities.

Who should pursue this
  • Companies with expertise in fiber optic design and installation
  • Contractors with experience in municipal projects
  • Firms that can provide testing and commissioning services
Work breakdown
  • Design of fiber optic infrastructure
  • Furnishing materials for installation
  • Installation of fiber optic cables and equipment
  • Testing of the installed system
  • Commissioning of the fiber optic network
Response package checklist
  • Completed bid forms
  • Company qualifications and experience
  • Detailed pricing proposal
  • Project timeline and milestones
  • Proof of insurance and bonding
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bidders must adhere to local and state regulations regarding fiber optic installations
  • Compliance with all safety and installation standards is mandatory
Pricing strategy
  • Consider a competitive pricing structure to attract the town's budget constraints
  • Detail pricing for each work breakdown element for clarity
Teaming and subs
  • Potential partnerships with local electrical contractors
  • Collaboration with suppliers of fiber optic materials
Risks and watchouts
  • Delays in material procurement leading to project timeline issues
  • Potential for design changes impacting costs
  • Need for clear communication with the town during installation
Smart questions to ask
  • What are the specific performance metrics expected from the fiber network?
  • Are there any existing infrastructure elements to consider in the design?
  • What is the budget range allocated for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for the fiber optic system required
  • Exact locations of town facilities for installation
  • Potential funding limits or budgetary constraints
  • Specific qualifications required for bidders
  • Relevant local ordinances affecting installation

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.